Storm Water

Project Name: St. Lucie County Administration Building Drainage Connection
Location:Fort Pierce, Florida
Owner: St. Lucie County
Year Completed/Contract Amount: 2018 / $131,417.49
Project Description: Drainage system improvements including removing existing inlets and installation of new FDOT Type C and Type E inlets with H2O Traffic Bearing Grates, installation of 18 inch RCP, installation of a yard drain, pavement cut and restoration.

Project Name: Big Cypress Seminole Indian Reservation Western Water Conservation Basin 2 Siphon 2
Location: Big Cypress Seminole Indian Reservation
Owner: United States Army Corps of Engineers (Prime Contractor -Maverick Constructors)
Year Completed/Contract Amount: 2017 / $8,704,808.86
Project Description: Construction of four pump stations, levees and canals.

Project Name: ADA and Drainage Improvements at Wabasso School
Location: Sebastian, Florida
Owner: School Board of Indian River County
Year Completed/Contract Amount: 2017 / $127,553.54
Project Description: Remove and replace concrete walk, ramps and stairs to meet ADA standards and update drainage system to capture downspout from walkway roof.

Project Name: S127 Command and Control North Shore Path Automation
Location:Glades, Martin and Okeechobee County (5 sites)
Owner: South Florida Water Management District (Prime Contractor Revere Control Systems
Year Completed/Contract Amount: 2016 / $307,965.70
Project Description: Miscellaneous repairs to 5 pump stations including handrail modifications, pump bay stilling wells, ceiling tile demolition, remove and replace waive guide entry, concrete pile staff gauge and installation of static dissipating tile.

Project Name: PC South Algal Nutrient Removal Facility
Location:Vero Beach, Florida
Owner: Indian River County
Year Completed/Contract Amount: $5,856,660.20
Project Description: Construction of an algal nutrient removal facility, stormwater pumping stations, force mains, and associated peripheral systems.
Click here to view more>>

Project Name: Ammonia System Activation for the West Water Treatment Plant
Location: Miramar, Florida
Owner: City of Miramar
Year Completed/Contract Amount: 2013/$228,054.00
Project Description: 1.] Furnish and install two (2) cabinet ammoniators on an existing concrete slab and housekeeping pad; 2.] Furnish and install one (1) fiberglass enclosure to house the ammoniators; 3.] Amonia will be fed to three (3) separate locations: a) Injection point A: The existing pre-storage tank injection manhole between the of the transfer pumps and 4.25 MG ground storage tank. Big Alternate (1) is a substitution of the Injection Point A. Instead of using the existing pre-storage tank injection manhole, install a new injection manhole as shown in the Contract Drawings. b) Injection Point D and C: The clearwell at the permeate degasifiers. 4.] Miscellaneous appurtenances including but not limited to; ball valves, vacuum release valves, unions, couplings, fittings and pipe supports.
Click here to view more>>

Project Name: Modifications to Egret Marsh Stormwater Park Floway
Location: Vero Beach, Florida
Owner: Indian River County
Year Completed/Contract Amount: 2013/$1,288,482.00
Project Description: Removal of Egret Marsh’s grid material and HDPE geomembrane lining; excavating, mixing, grading, and compavting existing material; and construction of a concrete algal turf scrubber surface.
Click here to view more>>

Project Name: West Dearborn Low Impact Development (LID) Stormwater Pilot Project
Location: Sarasota County, Florida
Owner: Sarasota County
Year Completed/Contract Amount:$5,962,619.70
Project Description: This project consists of the construction of biodetention/bio-retention systems, stormwater piping and structures, irrigation and landscape planting and miscellaneous streetscape items. The project also includes the construction of previous parking and sidewalks, permeable pavers, clearing and grubbing, pavement and sidewalk removal, excavation, grading and compaction, curbing, erosion and pollution control, pavement striping, signage and new pavilions.
Click here to view more>>

Project Name: Ocala Pine Reuse
Location: Ocala, Florida
Owner: City of Ocala
Year Completed/Contract Amount:2013/ $226,038.00
Project Description: Restoration of site, install 8” Electric Actuator & Valve at Resue System Piping, install 10” Electric Actuator & Valve at Reuse System Piping, Remove & Replace Automatic Strainer at Existing Resue System Piping, Install valve control system on existing Scada system, and electrical work.
Click here to view more>>

Project Name: S-63
Location: Osceola County, Florida
Owner: South Florida Water Management District
Year Completed/Contract Amount: 2011/ $1,108,549
Project Description: Reinforce concrete, single gates spillway with discharge controlled by a cable operated, vertical lift gate. The operation of the gate is manually controlled in accordance with seasonal operational criteria. It is located on Canal 34 about 3,300 feet east of State Road 523 and 2,000 feet downstream from Lake Gentry. Work consists of concrete repairs to the abutment walls and slab; sandblast and recoat all four steel sheet pile wing walls; dewatering and provide dry bypass requirements; replace and add staff gauges upstream and downstream; add stainless steel plating at the weir crest; add stainless steel plating along corners of the gate recess; replace existing gates with stainless gates and paint.

Project Name: S-59
Location: Osceola County, Florida
Owner: South Florida Water Management District
Year Completed/Contract Amount: 2011/ $1,089,775
Project Description: Reinforced concrete, single gates spillwau with discharge controlled by a cable operated, vertical lift gate. The operation of the gate is manually controlled in accordance with seasonal operational criteria. Project includes concrete repairs to the abutment walls and slab; sandblast and recoat all four steel sheet pile wing walls; dewatering and provide dry and wet season bypass requirements; replace and add staff gauges upstream and downstream; add stainless steel plating along corners of the gate recess; replace existing gates with stainless gates and paint. Diesel fuel delivered to the site for bypass pump system fueling.
Click here to view more>>

Project Name: SFWMD S332D PS Hardening
Location: Miami-Dade County, Florida
Owner: South Florida Water Management
Year Completed/Contract Amount:2011/ $772,600
Project Description: Hardening and upgrading to pump station S-332D. Including hurricane hardening of the pump house and the installation of bullet-proofing for the walls, roof and roofing system, exterior doors, louvers, HVAC upgrades and protective opening hoods. Also new weather-proof roof-mounted equipment access hatches, OSHA safety ladder, and roof perimeter safety railings and overall exterior re-painting of the pump house and supporting/exterior concrete foundations.
Click here to view more>>

Project Name: S331 Pump Station Hardening
Location: Miami-Dade County, Florida
Owner: South Florida Water Management
Year Completed/Contract Amount: 2011/ $581,968
Project Description: Including hurricane hardening of the pump house and the installation of bullet-proofing for the walls, roof and roofing system, exterior doors, louvers, HVAC upgrades and protective opening hoods. Also new weather-proof roof-mounted equipment access hatches, OSHA safety ladder, and roof perimeter safety railings and overall exterior re-painting of the pump house and supporting/exterior concrete foundations.
Click here to view more>>

Project Name: SFWMD G-40, G422, S26 Roof Repairs
Location: Palm Beach, Florida
Owner: South Florida Water Management District
Year Completed/Contract Amount: 2011/ $684,547
Project Description: Demolition and removal of all existing flashing, copings, roof insulation and built-up roof systems, and all project generated debris material at athe pump stations. New parapet walls in the lower roofs, provide new roofing system with Miami-Dade County product approval certification, and that meets district guidelines. New composite aluminum panels to cover coping and perimeter walls. Repair extension to all existing protective rain hoods in accordance with new district standards. New stainless steel box scuppers, overflow scuppers and downsprouts. Remove existing lighting protection system and replace with new lightning protection system.
Click here to view more>>

Project Description: St. Lucie West Service District Storm Water System Upgrade
Location: Port Saint Lucie, Florida
Owner: St. Lucie West Service District
Year Completed/Contract Amount: 2012/ $1,520,412.53
Project Description: Replacment and modification of (15) storm water structures, including installation of concrete and aluminum piping, installation of stilling wells, new gates, and radio automation at these locations. Also included is all associated excavation and site restormation.
Click here to view more>>

Project Name: Lakes Park Water Quality Restoration
Location: Lee County, Florida
Owner: Lee County, Florida
Year Completed/Contract Amount: 2012/ $4,067,796.30
Project Description: Construction of manmade filter marshes consisting of meandering peninsulas planted with native Florida vegetation creating a winding flow path. The winding flow path improves water quality by removing nutrients through a maximized flow distance and contact time between lake water and vegetative plantings. The job site consits of 77 acres, of which 23 are being utilized for construction and the remaining acerage is protected wetlands or uplands.
Click here to view more>>

Project Name: Powell Creek Preserve Filter Marsh and Hydrologic Restoration
Location: Lee County, Florida
Owner: Lee County, Florida
Year Completed/Contract Amount: 2012/ $1,773,839.50
Project Description: Construction of manmade filter marshes, winding trails, and a pump station. The water from Powell Canal is gravity fed to a pump distributing water through the filter marshes lined with aquatic vegetation to naturally remove nutrients from the water before it flows back to Powell Canal through Powell Creek. The job site consists of 77 acres, of which 23 are being utilized for construction and the remaining acreage is protected wetlands or uplands.
Click here to view more>>

Project Name: Compartment B South Build-out Inflow (G-435) Pump Station
Location: South Bay, Florida
Owner: South Florida Water Management District
Year Completed/Contract Amount: 2012/ $11,781,137.61
Project Description: Install (3) 160 cfs, motor driven stormwater pumps, a standby engine generator, axial flow wall fans, electrical equipment and instrumentation and control systems.
Click here to view more>>

Project Name: Indian River Estates Stormwater Improvements & Pump Station Phase One
Location: Port Saint Lucie, Florida
Owner: St. Lucie County, Florida
Year Completed/Contract Amount: 2009/ $4,839,686
Project Description: Construct CBS building to house pump station, install pumps, instrumentation & controls, underground piping, retention pond, inlet and outfall structures.
Click here to view more>>

Project Name: Platt’s Creek Stormwater Treatment Alum Facilities
Location: Port Saint Lucie, Florida
Owner: St. Lucie County, Florida
Year Completed/Contract Amount: 2008/ $230,197
Project Description: Install Alum Injection system including six chemical pumps, FPR storage tank, electrical and mechanical.
Click here to view more>>

Project Name: Taylor Creek Algal Turf Scrubber and Pump Station
Location: Okeechobee, Florida
Owner: South Florida Water Management District
Year Completed/Contract Amount: 2007/ $1,117,822
Project Description: Constructed facility to remove phosphorous from water in Taylor Creek using patented system, including pump stations, 40 mil HDPE Liner, prefab structures and associated underground piping and retention ponds.
Click here to view more>>

Project Name: East Conveyance Canal Pump Stations
Location: Big Cypress Seminole Indian Reservation, Florida
Owner: Seminole Tribe of Florida
Year Completed/Contract Amount: 2004/ $1,177,122
Project Description: Construction of three pump stations to convey water including fuel systems, electrical, SCADA systems, and sheet piling.
Click here to view more>>