Chiller Experience

Project Name: Eastern Regional Water Supply Facility Laboratory Air Flow Control System
Project Owner: Orange County
Amount/Year Completed: 2016 / $1,454,014.63
Project Description: Replacement of Laboratory Airflow Control System including new supply air valves and exhaust air valves. Includes control software, programming, Dell computer and monitor. Replacement of Air-Cooled Water Chillers including interface with the building management system.

Project Name: Orange Regional Juvenile Detention Center
Year Completed: April 2002/May 2002
Project Description: On site supervisor. 80 ton chilled water system. Installed (2 each) new chiller pumps including electrical. Connected new chiller lines to existing air handler units. Maintenance air handler units including: cleaned coils, lubricated bearings, cleaned drains, and pulled and cleaned water filter strainer baskets.

Project Name: Polk Regional Juvenile Detention Center
Year Completed:April 2002/June 2002
Project Description:On site supervisor. 40 ton chilled water system. Furnished and installed 40 ton chiller unit. Demolished and replaced water piping and insulation. Installed a new circulation pump, serviced air handler units and installed new water temperature and line pressure gauges. Provided a temporary 40 ton chiller unit.

Project Name: Sago Palms Regional Juvenile Detention Center
Year Completed: Sept 2002/Nov 2002
Project Description: On site supervisor. 60 ton chilled water system. Maintenance unit including: system documentation, cleaned each control cabinet, checked all electrical connection, tested and adjusted Freon levels on all units, all motors and belts tested, tightened, or replaced, oiled motors and checked running operation. Checked amp of each unit and corrected any conflicts. Repaired wiring.

Project Name: Orange Regional Juvenile Detention Center
Year Completed:2006
Project Description:On site supervisor. 80 ton chilled water system. Demolished and replaced all chilled water piping and insulation.

Project Name: West Palm Beach Regional Juvenile Detention Center
Year Completed:Jan 2006/March 2006
Project Description:On site supervisor. 80 ton chilled water system. Demolished and replaced all chilled water piping and insulation.

Project Name: Miami DOT Building
Year Completed: April 2006/May 2006
Project Description: On site supervisor. 40 ton chilled water system. Removed and replaced (4 each) air handlers. Repaired chiller lines re-piping work, replaced flow valves and thermostats.

Project Name: West Palm Beach Regional Juvenile Detention Center
Year Completed: May 2006
Project Description: On site supervisor. 80 ton chilled water system. Removed and replaced defective 80 ton compressor, factory start up.

Project Name: West Palm Beach Regional Juvenile Detention Center
Year Completed:May 2006/June 2006
Project Description:On site supervisor. 80 ton chilled water system. Demolished and replaced duct work around air handlers (10 each). Maintenance all existing duct work.

Project Name: West Palm Beach Regional Juvenile Detention Center
Year Completed: Aug 2006/Nov 2006
Project Description: On site supervisor. 80 ton chilled water system. Installed a stand alone control system for air handler stations (12 each), support chiller piping, tested, and balanced.