Institutional Experience

Project Name: Eckerd 50-Bed Facility and Classrooms
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2002, $3,499,127
Project Description: Complete remodel of an existing building to house 50 juvenile clients. New construction of (2) classroom buildings.
Click here to view more>>

Project Name: Palm Beach DJJ Concrete Building
Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2008, $176,335
Project Description: Construct concrete building.
Click here to view more>>

 

Project Name: Eckerd Kroger Generator
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2007, $116,355
Project Description: Exterior Doors : Replace (3) exterior doors, hinges, weather stripping, thresholds, and closers. Doors to be 3′ x 6’8” fire rated. Door Closers : Replace (7) interior door closers, and replace (7) door stops. Base : Replace all vinyl base with wood base, and prime all new wood base before installing. Bathroom Door : Replace 3′ x 6’8” bathroom door with like new wood (fire rated doors). Repair Walls and Ceilings : Repair ceiling and wall damages and then paint new work. VCT : Install 1425 S.F. of VCT. Remove Carpet : Remove all existing carpet. Countertop : Remove all existing concrete countertop in bathroom, and install new solid surface countertop. Stainless Steel Mirrors : Remove damaged mirrors, and install (5) new stainless steel mirrors. Plumbing : Remove (4) existing sinks and fixtures, install (4) new sinks and fixtures, install one new toilet seat, and install one new water cooler. Fire Extinguishers : Replace (2) surface mounted fire extinguishers and cabinets, and replace (1) recess mounted fire extinguisher and cabinet. HVAC : Replace all supply, return, and exhaust registers with maximum security registers. Electric : Replace (6) exit lights, replace all device plates with stainless steel covers, reconnect (2) new exhaust fans supplied by mechanical contractor, re-feed (2) new split air conditioning systems with new fused disconnects, re-lamp and repair all fluorescent fixtures, and replace (7) broken or discolored light lenses. Holding Cell Door : Replace 10” x 10” glass in holding cell door. Pressure Clean : Pressure clean janitors closet in bathroom, and pressure clean bathroom walls. Replace Doors : Remove existing doors and replace with fire rated doors. New Wall : Install new 20′ wall in day room, and install new fire rated door in wall.
Click here to view more>>

Project Name: Glades Correctional Metal Building
Location: Glades County, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount:2007, $137,910
Project Description: Remodel existing metal building.
Click here to view more>>

 

Project Name: Eckerd Youth Development Roofs
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2007, $111,471
Project Description: Roof: Mechanically attach one layer of G-2 base sheet, fully adhere with type 111 asphalt, one layer of Fiberlite Fleece 45 mil membrane, heat welding all seams creating a monolith roof system, fabricate and install new Fiber-clad metal to the perimeter edge in a drip edge design, fabricate and install new .040 aluminum fascia over the existing wood fascia, field wrap as many penetrations as possible eliminating the need for pitch pans, supply and install new prefabricated pipe boots to all soil risers, and install details in accordance with all Seaman Corporation, State and local codes.
Click here to view more>>

Project Name: Seminole RJDC Re-roofing
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2006, $163,444
Project Description: Install new roof where the leak occurred would be pulled back to remove any wet insulation board that had been installed so that there will not be a mold problem, install new roof scuppers, scrape and repaint two cells, replace two light fixtures and one smoke detector, and remove all moisture.
Click here to view more>>

Project Name: Eckerd Cafeteria
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2004, $1,252,943
Project Description: 9,000 S.F. cafeteria and kitchen for youth facility.
Click here to view more>>

Project Name: Wings For Life General Reparis
Location: Miami, Florida
Owner: Amikids Wings of South Florida, Inc.
Year Completed/Contract Amount:2007, $81,823
Project Description: Repair storage room to baby wash, wash station, kitchen cabinets, cabinets with drawers, modify a window, relocate an existing wall, replace the front door, install two windows, replace appliances, refrigerator for office station, modify the gate/CCTV/Intercom, patch the roof on building B, enlarge pantry in the kitchen, and additional fill 200 yards (spread).
Click here to view more>>

Project Name: Wings Roof
Location: Miami, Florida
Owner: Amikids Wings of South Florida, Inc.
Year Completed/Contract Amount:2007, $236,512
Project Description: Roof: Mechanically attach one layer of G-2 base sheet, fully adhere with type 111 asphalt, one layer of Fiberlite Fleece 45 mil membrane, heat welding all seams creating a monolith roof system, fabricate and install new Fiber-clad metal to the perimeter edge in a drip edge design, fabricate and install new .040 aluminum fascia over the existing wood fascia, field wrap as many penetrations as possible eliminating the need for pitch pans, supply and install new prefabricated pipe boots to all soil risers, and install details in accordance with all Seaman Corporation, State and local codes.
Click here to view more>>

Project Name: Desoto JCF Roofing
Location: DeSoto, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2006, $468,388
Project Description: Building # 55: Install 45 square laminated 30 year composite shingle roof including felt, remove 42 square laminated 30 year composite shingle roofing including felt, remove 42 square single ply .060 PVC membrane mechanically fastened, remove and replace 326 FT 1 x 6 # 1 Pine Fascia, and prime and paint 326 feet exterior fascia. Building # 54: Install 44.42 square 30 year laminated composite shingle roofing including felt, remove all 41.20 square 30 year laminated composite shingles including felt, remove 41.20 square single ply .060 PVC membrane mechanically fastened, remove and replace 296 feel 1 x 8 fascia, and prime and paint 296 feet exterior fascia. Building # 45: Install 41.50 square laminated 30 year composite shingle roof including felt, remove 38.75 square laminated 30 year composite shingle including felt, remove and replace 24 feet flashing, remove 38.75 square single ply .060 PVC membrane mechanically fastened, remove and replace 3.20 square single ply membrane mechanically fastened, remove and replace 305 feet 1 x 10 trim board, remove and replace 305 feet 1 x 4 trim board, and prime and paint 305 feet fascia/trim board. Building #42: Install 33.50 square laminated 30 year composite shingle roof, remove 31.20 square laminated 30 year composite shingle roof including felt, remove 31.25 square single ply .060 PVC membrane mechanically fastened, remove and replace 9.25 square single ply membrane mechanically applied- 60 mil, remove and replace 242 feet 1 x 10 trim board, and prime and paint 242 feet fascia/trim. Building # 37: Install 44.75 square laminated 30 year composite shingle, remove 44.75 square laminated 30 year composite shingle, remove 36.75 square single ply .060 PVC membrane fastened, remove 44.75 square additional layer of composite shingles, remove and replace 254 feet 1 x 6 #1 Pine, and prime and paint 254 feet fascia. Building # 38: Install 44.75 square laminated 30 year composite shingle, remove 42 square laminated 30 composite shingle including felt, remove all 44 square single ply .060 membrane mechanically fastened, remove and replace 267 feel 1 x 6 fascia, and prime and paint 267 feet fasica. Building # 39: Install 44.75 square laminated 30 year composite shingle, remove 42 square laminated 30 year composite shingle including felt, remove 42 square single ply .060 PVC membrane mechanically fastened, remove and replace 267 feel 1 x 6 fascia, and prime and paint 267 feet fascia. Building # 41: Install 6.78 square single ply .060 PVC membrane mechanically fastened, and install single ply membrane mechanically attached- 60 mil.
Click here to view more>>

Project Name: Polk RJDC Bathroom Renovations
Location: Bartow, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2008, $332,050
Project Description: Mode 5 Large Shower and Bathroom: Remove and replace ceramic wall and floor tile, remove and replace (4) 1′ x 4′ and (3) 1′ x 1′ security grade, recessed, fluorescent light fixtures, remove and replace plaster ceiling over shower area, remove and replace (2) stainless steel privacy partitions, paint non-tiled areas, install (2) shower head and control units, remove and replace (3) stainless steel wall hung lavatories, remove and replace (2) stainless steel toilets, and remove and replace (1) stainless steel urinals.
Mode 1 Large Shower and Bathroom: Remove and replace ceramic wall and floor tile, remove and replace (4) 1′ x 4′ and (3) 1′ x 1′ security grade, recessed, fluorescent light fixtures, remove and replace plaster ceiling over shower area, remove and replace (2) stainless steel privacy partitions, paint non-tiled areas, install (2) shower head and control units, remove and replace (3) stainless steel wall hung lavatories, remove and replace (2) stainless steel toilets, and remove and replace (1) stainless steel urinal.
Mode 1 Small Shower and Bathroom: Remove and replace ceramic wall and floor tile, remove and replace (1) 2 x 2 and (2) 1 x 1 security grade, recessed, fluorescent light fixtures, remove and replace plaster ceiling, remove only stainless steel partitions, paint non tiled areas, install (2) double shower heads with controls, remove and replace stainless steel lavatory, and install stainless steel toilet.
Mode 1 Staff Bath (Hallway): Remove and replace ceramic wall and floor tile, remove and replace light fixture, paint non-tiled areas, remove and replace stainless steel lavatory, remove and replace stainless steel toilet, paint ceiling, remove and replace paper towel dispenser, and remove and replace toilet paper holder.
Intake Bathrooms: Remove and replace wall and floor tile, remove and replace (2) security grade, recessed, fluorescent light fixtures, remove and replace plaster ceiling, paint ceiling, remove and replace (1) shower head and control, remove and replace (1) stainless steel toilet, and remove and replace (1) stainless steel urinal.
Staff Lounge Bathroom: Remove and replace ceramic wall and floor tile, remove and replace (1) 2′ x 4′ standard recessed fluorescent light fixture, remove and replace vanity and sink (new sink to be porcelain), remove and replace toilet, new toilet to be flush valve, remove and replace mirror, soap dispenser, toilet paper holder, and toilet seat protector. Food Service Bathroom: Remove and replace ceramic wall and floor tile, remove and replace (1) 2′ x 4′ standard recessed, florescent light fixture, paint ceiling, remove and replace vanity and sink (new sink to be porcelain), remove and replace toilet, remove and replace mirror, soap dispenser, toilet paper holder, and toilet seat protector dispenser.
Clerical Bathrooms: Remove and replace ceramic wall and floor tile, remove and replace (3) 2” x 4” security grade, recessed, florescent light fixtures, remove and replace toilet partitions, paint ceiling, remove and replace vanity and (2) porcelain lavatories, remove and replace (2) toilets in woman’s bathroom and (1) toilet and (1) urinal in the men bathroom, fixtures are figured to be porcelain, remove and replace mirror, soap dispenser, toilet paper, toilet seat protector dispenser, and remove and replace sanitary napkins dispenser in the women’s bathroom.
Lobby Bathroom: Remove and replace ceramic wall and floor tile non-tiled areas are to receive tile, remove and replace (3) 2” x 4” security grade, recessed, florescent light fixtures, remove and replace toilet partitions, paint ceiling, remove and replace vanity and (2) porcelain lavatories, remove and replace mirror, soap dispenser, toilet paper holder, toilet seat protector dispenser, and remove and replace sanitary napkin dispenser in the women’s bathroom.

Project Name: Wilson Youth Academy Drain Field Repair
Location: Land O’ Lakes, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2008, $66,298
Project Description: Drain Field Repair: Quote based on 3830 GPD flow rate, install 4,800 S.F. of drain field, install 1,200 feet of PVC, system engineering, excavate and dispose of old drain field per 64E6 code, 36” fill mound, 24” excavation, cover system, and sod.

Project Name: Polk RJDC Painting
Location: Bartow, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount:2008, $155,400
Project Description: Paint the interior and exterior of the above referenced building.

Project Name: Eckerd Intensive Halfway House Electrical Upgrade
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2008, $90,311
Project Description: Electric: Remove existing obsolete GE panels “A”,”B”,”C”, &”D”, remove existing electrical devices, switches, and light fixtures, install (1) panel A, square D, QOB 200 amp 120-208-volt three phase “WYE” main breaker 30 circuit Nema 1 panel with flush cover, install (3) panel B, C, & D- Square D QOB 100 amp 120-208 volt three phase “WYE” MLO 30 circuit Nema 1 panel with flush cover, remove all existing service feed conductors and install proper sized copper conductors for all panels, install grounding for service panels and sub panels as per code, install (4) air conditioner package unit service disconnects as per code, install proper sized conductors and breakers for (4) air conditioner package units as per code, install (1) 30 amp 250 volt circuit and service disconnect for water heater, install (5) Lithonia 250 watt metal haide wall pack exterior lights photo cell controlled, install (1) Lithonia LC6 recess can light at front door exterior photo cell controlled, install (30) Lithonia LB 432 wrap around fluorescent fixtures with T-8 lamps and electronic ballasts, install (8) Lithonia LC 232 wrap around fluorescent fixtures with T-* lamps and electronic ballasts, install (2) Progress P3015-30 wall mount vanity lights, install (2) Nutone #763RLN bathroom exhaust fan/light conbo, install (9) Lithonia exit lights with dual head emergency lights and battery back up, install (2) Nutone 52” white ceiling fans, install (1) thru the wall exhaust fan in common bathroom area, install (3) GFI protected service receptacles as per code. One at each air conditioner unit, install (3) GFI protected receptacles in bathroom as per code, and install (60) 20 amp 120 volt duplex receptacles as per code and walk thru with owner representative.

Project Name: Eckerd Generator Water Plant
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2008, $124,276
Project Description: Generator: Install (1) 125 KW 120-208 volt three phase “WYE” diesel generator with 72 hour base tank, install (1) 400 amp 120-208 volt three phase main breaker disconnect on exterior of building, (1) 400 amp 120-208 volt three phase “WTE” N3R “ATS” on exterior of building, install (1) new 3” rigid riser with four (4) 500 MCM THHN and (1) #2 THHN ground from the generator to the “ATS”, install (1) 1” conduit with control wiring from generator to “ATS”, install (1) 20 amp 120 volt circuit from panel “MDP” to the generator fro water jacket heater, install (1) 8′ x 10′ x 8” concrete pad for generator, install (1) remote enunciator in master control area or office area, fill the generator fuel tank with diesel at the time of walk thru inspection, start up and load bank test, staff training seminar, and issue 5 year warranty provided through Cummins Power South, LLC. Fence: Install (1) 6′ tall x 8′ x 10′ chain link fence enclosure around generator with one walk through gate.

Project Name: Eckerd Room 10, Class 1,2 and 3
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2007, $130,931
Project Description: Doors : Remove and replace (6) exterior doors, threshold, closer, and hinges using the same lock, and install (3) new solid core wood doors on new HVAC closet. Three HVAC Closets : Frame up with 2 x 4 wood framing for new HVAC closet, install drywall inside and out, and paint new walls. Three Window Openings : Window HVAC units to be removed by maintenance at the facility, install

Project Name: Eckerd Kroger Cottage
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2007, $216,742
Project Description: Design, demo, structural, and construction to complete the 5,200 S.F., 16 bed, open bay cottage.

Project Name: Eckerd Carver Generator
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2007, $87,499
Project Description: Bathroom: Remove (3) mirrors and replace with stainless steel mirrors, remove concrete counter top, install new solid surface counter top, remove (3) sinks and faucets and replace with new ones, remove paper from walls, clean and prep walls for paint, paint walls, pressure clean walls and floor of janitor closet, Bondo metal jamb of janitors closet, paint door and jamb of janitors closet, pressure clean ceramic tiles walls and floor, install (2) pieces 2″ x 2″ ceramic tile, clean all plumbing fixtures, remove door to restroom and replace with solid core wood door, and replace hinges and closer on restroom door (using same lock). Security Room: Clean and prep walls for painting, and paint walls. Employee Restroom: Clean and prep walls for paint, clean floor and wall ceramic tile, and paint walls. Doors; Sand, prime, and paint (17) doors, install (17) new door closers, and remove and replace all wall door stops. Area Where Kids Sleep: Replace (12) pieces of 1′ x 1′ ceiling tile, clean and prep walls in all areas, paint walls, work on one set of double doors by setting hinges correctly and shimming doors to work, and install new hinges on double doors. Electric: Remove and replace with new (5) exit signs, remove and replace (8) lens covers on light fixtures, install (1) # 8 conductor thermostat wire from RTU to thermostat location designed by HVAC contractor in Dorm sleeping area, and install # 2 wire shielded cable from return air sensor to thermostat location in Dorm sleeping area. T.V. & Activity Room: New door separating day room, install new grille in door with security grille, and back door needs new light kit, threshold, and door closer. Plumbing: Remove existing water fountain and replace with a new water fountain. Flooring: Remove all carpet and replace those areas with new VCT, strip wax from all VCT, and install (5) coats of wax and burnish last coat. HVAC: Replace all existing supply and return register with maximum security registers.

Project Name: Eagle Cottage HVAC Replacement
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2007, $19,850
Project Description: The existing unit grounded and will by replaced by the following: Install one ten ton 280/230 volt 3 phase split system including equipment by Trane, line sets, drains, phase monitors, cutting, patching, thermostats, and concrete cutting.

Project Name: Eckerd Adams Renovation
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2007, $112,729
Project Description: Exterior Doors: Replace (5) exterior doors, hinges, weather stripping, thresholds, and closers. Door Closers: Replace (11) interior door closers, replace (11) interior door stops. Base: Replace all vinyl base with wood base, and prime all new wood base before installing. Bathroom Door: Replace 3′ x 6’8″ bathroom door with like new wood fire rate door, and we used existing hardware. Metal Access Cover: Replace 18″ x 18″ metal access cover with new one with lock. Repair ceiling and damaged walls, then paint over replacements. VCT: Install 1423 S.F. of VCT, remove all existing carpet. Countertop: remove existing countertop in bathroom and install new countertops. Stainless Steel Mirrors:

Project Name: Eckerd Johnson Generator
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2007, $118,001
Project Description: Replace owner supplied generator- build a new concrete structure and slab for the new generator, install new PVC piping, and install generator.

Project Name: Eckerd Robinson Cottage and Generator
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2007, $118,001
Project Description: Bathroom: Remove (4) mirrors, remove (4) faucets and sinks, remove concrete countertop, install (4) stainless steel mirrors, install (4) new faucets and sinks, install new solid surface countertop, pressure clean walls and floors, and patch holes in ceramic tile walls. Walls and Ceiling Patch: Patch holes in walls and ceilings. Baseboard: Remove all vinyl base and install new wood base where the vinyl base was removed. Painting: Prep all interior walls and doors for paint, prime all walls and doors, and paint all interior walls, doors, and jambs. Door Closers: Remove (11) existing door closers, install (11) new door closers, remove (11) damaged door stops, and install (11) new door stops. Carpet: Remove existing carpet from cottage. Doors: Remove and replace two interior wood doors, and remove and replace on exterior door, threshold, and weatherstripping. Repair Existing Doors: Interior doors and jambs need sanding, plugging, and bondo work. Plumbing: Remove existing water drinking fountain and replace with a new one. Lexan: Remove 120 pieces of scratched lexan and replace with new 7/16″ safety glass. Flooring: Install new VCT flooring where old carpet has been removed, strip all old VCT floors, and wax with five coasts all VCT flooring throughout the facility. HVAC: Replace all existing supply and return exhaust registers with maximum security registers, replace one four ton Trane rooftop package unit, one 15 ton rooftop package unit, one 8 ton split system, and three rooftop exhaust fans. Cleaning: Cleaning service to come in and clean the entire inside of the facility. Electric: Replace four existing exit lights with vandal type exit lights, install one 1′ x 2′ surface mount vandal type fluorescent light fixture, and replace (7) busted switch plates.

Project Name: Eckerd Water Plant Generator
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2007, $124,276
Project Description: Renovate existing generator and housing.

Project Name: Eckerd Adams Cottage Remodeling
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2007, $210,371
Project Description: Exterior Doors: Replace (3) exterior doors, hinges, weather stripping, thresholds and closers. Door Closers: Replace (7) interior door closers, and (7) door stops. Base: Replace all vinyl base with wood base, and prime all new wood base before installing. Bathroom Door: Replace 3′ x 6’8″ bathroom door with like new wood fire rated door (using existing hardware) Repair Walls and Ceilings: Repair damaged ceiling and walls, then paint. VCT: Install 1425 SF of VCT, and remove all existing carpet. Countertop: Remove all existing concrete countertop in the bathroom, install new solid countertop. Stainless Steel Mirrors: Remove damaged mirrors, and install (5) new stainless steel mirrors. Plumbing: Remove (4) existing sinks and fixtures, install (4) new sinks and fixtures, install (1) new toilet seat, and (1) new water cooler. Fire Extinguishers: Replace (2) surface mounted fire extinguishers and cabinets, and replace (1) recess mounted fire extinguisher and cabinet. Interior Paint: Paint all interior walls, doors, and jambs. Interior Doors and Jambs: Repair all interior doors and jambs. Lexan: Remove and replace (137) pieces of Lexan with 7/16″.HVAC: Replace all supply, return, and exhaust registers with maximum security registers. Electric: Replace (6) exit lights, replace all device plates with stainless steel covers, reconnect (2) new exhaust fans supplied by mechanical contractor, re-feed (2) new split air conditioning systems with new fused disconnects, re-lamp and repair all fluorescent fixtures, and replace (7) broken or discolored light lenses. Cleaning and Floor Wax: Professional cleaning company to come in and dust and clean interior, and strip wax off old VCT and install (5) coats of wax on all old and new VCT.

Project Name: Eckerd YDC Re-roofing Building 3 & 4
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2007, $181,596
Project Description Roof S.F. 11.657; remove two existing roofs down to the gypsum deck, clean up and haul to the landfill, mechanically attach one layer of G-2 base sheet, fully adhere with type 111 asphalt, one layer of Fiberlite Fleece 45 mil membrane, heat welding all seams creating a monolith roof system, fabricate and install new Fiber-Clad metal to the perimeter edge in a drip edge design, fabricate and install new .040 aluminum fascia over wood fascia, field wrap as many penetrations as possible eliminating the need for pitch pans, supply and install new pre-fabricated pipe boots to all soil risers, and install details in accordance with all Seaman Corporation, state and local code requirements.

Project Name: Sago Roof Coating 4 Buildings
Location: Pahokee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2007, $210,964
Project Description Termination bars removed, cleaned, replaced, and waterproofed, install Astec system, tighten all loose screws and self tapping screws were installed to replace missing screws and close open seams, pressure wash roof to remove all dirt and debris, apply Astec #4000 surface conditioner to entire area, apply rust inhibitor to all corroded surfaces, tighten all seams, and apply Astec ceramic finish coat.

Project Name: Palm Beach RJDC Sewer Camera
Location: Palm Beach, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2007, $87,404
Project Description Plumbing: Install (1) Bradley WC7230FM stainless steel wall hung water closet, and assist Omini Eye with labor to complete TV inspection of sewer lines and smoke in test facility. Smoke Test: In cooperation with Echols Plumbing personnel, Omini Eye will pressure test all sewer and vent lines within subject building with a non toxic smoke like vapor approved for use in A/C systems and air conditioned living spaces. Building sewer and vent systems will be sectionalized by cleanout and manhole isolation in order to test the smallest section at a time ensuring the most efficient test and accurate results. Closed Circuit TV Inspection: Inspect sanitary sewer and vent systems to confirm condition and locations of existing lines, and document sizes, materials and faults. Echols Plumbing personnel shall be available to remove and replace toilets, fittings and other such plumbing items to ensure Omini Eye inspection technicians the best chance to inspect the greatest amount of sewer and vent lines. Omini Eye will provide a tape of disc of inspections together with reports indentifying anomalies and viability for rehabilitation using trench lining and/or pipe bursting methods.

Project Name: Eckerd Adams Cottage Remodel
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2007, $219,589
Project Description Exterior Doors: Replace (5) exterior doors, hinges, weather stripping, thresholds, and closers: Door Closers: Replace (11) interior doors, and replace (11) door stops. Base: Replace all vinyl base with wood base, and prime all new wood base before installing. Bathroom Door: Replace 3′ x 6’8″ bathroom door with like new wood fire rated door. Metal Access Cover: Repair ceiling and damaged walls, then paint over new repairs. VCT: Install 1425 S.F. of VCT. Remove Carpet: Remove all existing carpet. Countertop: Remove existing concrete countertop in bathroom, and install new solid surface countertop. Stainless Steel Mirrors: Remove damaged mirrors, and install (5) new stainless steel mirrors. Plumbing: Remove (5) existing sinks and fixtures, install (5) new sinks and fixtures, install (1) new toilet seat, and install (1) new water cooler. Fire Extinguishers: Replace (2) surface mounted fire extinguishers and cabinets, and replace (1) recess mounted fire extinguisher and cabinet. HVAC: Replace all supply, return, and exhaust registers with maximum security registers. Electric: Replace (6) exit lights, replace all device plates with stainless steel covers, reconnect (2) new exhaust fans supplied by mechanical contractor, re-feed (2) new split air conditioning systems with new fused disconnects, re-lamp and repair all fluorescent fixtures, and replace (7) broken or discolored light lenses. Cleaning and Floor Wax: Professional cleaning company to come in and dust and clean interior, and strip wax of old VCT and install (5) coats of wax on all old and new VCT.

Project Name: Broward Intensive House Generator
Location: Pompano, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2007, $109,798
Project Description Generator; Install (1) 10′ z 15′ z 12″ concrete slab with double mat of #5 rebar for new generator to sit on, remove existing 50KW 120-208 volt three phase automatic transfer switch, provide and install one 800 amp 120-208 volt three phase N3R main breaker enclosure with one 2P800 amp main breaker for new service disconnected ahead of new “ATS”, install (2) 4″ conduit with four 600 MCM THHN and one (1) #1/0, install (2) 3″ conduit with four 350 MCM THHN and one #2 THHN ground from new diesel generator to new “ATS”, install one 1″ conduit with control wiring from new diesel generator to new RATS”, install one 3/4″ conduit with three #12 THHN from panel A to new diesel generator fro battery charger, load and transport one 150 kw 120-208 volt three phase diesel generator from Everglades DJJ facility to Broward County Halfway House, set 150kw diesel generator in place and anchor to new concrete slab, provide one four hour load bank test on diesel generator, and provide one diesel fuel fill up for load bank test and operation.

Project Name: Eckerd Sewer Line
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2007, $66,188
Project Description Camera: Complete inspections of all main sewer system lines, multiple lift stations and all manhole to manhole runs, and survey Sewage Collection System.

Project Name: St. Lucie RJDC
Location: St. Lucie County, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2007, $245,133
Project Description Remodel existing building.

Project Name: Bartow Youth Training
Location: Bradenton, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2007, $129,625
Project Description Bartow To Lakeland One Unit: disconnect unit from electrical power, dismantle unit and remove tie downs, anchors, piers and pads, prepare unit for transportation, which will include axles, wheels and tongues, transport the two sides to Lakeland, set up and tie down per local codes on site, trim out, install stairs, remove axles, wheels and tongues, and seal roof. Bartow to Arcadia One Unit: disconnect unit from electrical power, dismantle unit and remove tie downs, anchors, piers and pads, prepare unit for transportation, which will include axles, wheels and tongues, transport the two side to Arcadia, set up tie down per local codes on site, trim out, install stairs, remove axles, wheels, and seal roof. Remove 14′ high fence, hardware cloth, concertina wire, and cattle chutes to allow removal of portables.

Project Name: Classroom Building #5 Room #7 Eckerd Youth Facility C
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2007, $48,417
Project Description Doors: Remove and replace exterior door, threshold, closer, and hinges (using the same lock), and install new solid core wood door on new HVAC closet. HVAC Closet: Frame up with 2 x 4 wood framing for new HVAC closet, install drywall inside and out, and paint new walls. Window Openings: Window HVAC units to be removed by maintenance at the facility, install 1/2″ plywood on inside of windows attaching to window frames, install 5/8″ drywall over plywood, paint and caulk all new work, install 4″ plywood on exterior side of windows, install 8″ hardiplank siding over plywood, and paint and caulk all new work. Electrical: Terminate one new condenser unit and one new air handler unit in class room area, and install one keyless fixture and one 15 amp single pole switch in mechanical room. HVAC: Install one 3 Y. ton split system, install includes: Equipment by Lennox/Trane/Carrier, custom built metal air handler stand, refrigerant line set, condensate line and safety, galvanized metal duct system, outside air louver with motorized air damper, supply and return grille security type, permanent filter frames and one roll media per system, phase monitor, seven day programmable thermostat, concrete slab for condenser unit, and fence for condenser. Carpet: Remove existing carpet, install new VCT, and install five coats of wax and burnish last coat. Paint: Paint interior walls, and repair ceiling.

Project Name: Eckerd Classroom 5 Bldg 7 Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2007, $72,642
Project Description: Doors : Remove and replace all exterior door, threshold, closer, and hinges, using same lock, and install new solid core wood door on new HVAC closet. HVAC Closet: Frame up with 2 x 4 wood framing for new HVAC closet, install new drywall inside and out, and paint new walls. Window Openings: Window HVAC units to be removed by maintenance at the facility, install %z” plywood on inside of windows attaching to window frames, install 518″ drywall over plywood, paint and caulk all new work, install AI” plywood on exterior side of windows, and install 8″ hardplank siding over plywood. Electrical Terminate one new condenser unit and one new air handler unit in class room area, and install one keyless fixture and one 15 amp single pole switch in mechanical room. HVAC: Install (1) 3′/ ton split system. Carpet: Remove existing carpet, install new VCT, and install (5) coats of wax and burnish last coat.

Project Name: Plumbing Everglades Youth Facility
Location: Miami, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2007, $51,586
Project Description: Block Walls: Bust holes through existing block walls to get the plumbing outside the building, build a chase to house new exterior plumbing, repair all holes made to walls, and paint all of our repairs and chases. Plumbing: Repipe existing water lines to shower valves, lavatories, and water closets in Gang bathroom at Alpha, Bravo, and Charlie Dorms.

Project Name: Eckerd Building #79 Roof
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2007, $30,405
Project Description: Fascia and Soffit : Remove rotten fascia and soffit from building, cut back gyp roof, cut back metal bar joist so there is only 16″ of overhang, install new fastening system on metal bar joists, install new fascia, and install new soffit. Roof : Mechanically attach one layer of G-2 base sheet, fully adhere with type 111 asphalt, one layer of Fiberlite Fleece 45 mil membrane, heat welding all seams creating a monolith roof system, fabricate and install new .040 aluminum fascia over the existing wood fascia, field wrap as many penetrations as possible eliminating the need for pitch pans, supply and install new prefabricated pipe boots to all soil risers, and install details in accordance with all Seaman Corporation, State and local codes.

Project Name: Eckerd Halfway House Cottage Roof
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2007, $475,902
Project Description: Mechanically attach one layer of G-2 base sheet, fully adhere with type 111 asphalt, one layer of Fiber-Clad metal to the perimeter edge in a drip edge design, fabricate and install new .040 aluminum fascia over the existing wood fascia, field wrap as many penetrations as possible eliminating the need for roof pitch pans, supply and install new prefabricated pipe boots to all soil risers, and install details in accordance with all Seaman Corporation, state and local code requirements.

Project Name: Sago Palms Academy Painting
Location: Pahokee, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2007, $266,397
Project Description: Painting: Paint 23,600 S.F. of interior drywall walls, paint 8,0070 S.F. of interior block walls, paint (80) interior doors and jambs, and paint (38) interior window frames. Roofing: Alpha Building: Remove and replace (40) LF of damaged gutter, replace (3) sections of missing damaged downspout, remove and replace (3) damaged roof panels. Bravo Building: Remove and replace (80) LF of damaged gutter, replace (4) sections of missing/damaged downspout, and repair the gutter over the courtyard entry door and add downspout assembly. Charlie Building: Remove and replace (30) LF of damaged gutter, replace (4) sections of damaged/missing downspout, repair the gutter over the courtyard entry door and add additional downspout assembly, remove and replace approximately 2300 S.F. of damaged/missing metal roof, and remove and replace 50 LF of damaged ridge metal. Delta Building: Replace (2) sections of damaged/missing downspout, remove and replace 80 LF of damaged ridge material, and repair the leaks over outside window of the lockdown area. Echo Building: Replace (6) sections of damaged/missing downspout, remove and replace 80 LF of damaged ridge material, and repair the leaks over the outside window of the lockdown area. Pavilion: Replace 250 LF of damaged/missing gutter, and replace (8) sections of damaged missing downspout. Court Yard: Remove and replace approximately 150 LF of damaged/missing gutter, and replace (5) sections of missing downspout. Vainty Tops: Remove and replace two handicap vanity tops (one in room B121 and one in room B122). Pressure Clean: Pressure clean the bottom 4′ of Bravo Building. Sealer: Install concrete sealer to the bottom 32″ of Bravo Building to keep seeping water out. Vinyl Base: Install vinyl base over all interior block walls. Ceramic Tile: Remove and replace 10 pieces of 4″ x 4″ wall ceramic tile, and seal grout of ceramic tile on floor in rooms B121 and B 122. Clean Furniture: The facility will back the 4 semis of furniture up to one of the cleaned out shop areas and set it in the cleaned out shop area, EQAC will clean the furniture, and the facility will move the furniture back into the facility. Electrical: Install (4) 18″ wall mount single speed exhaust fan in bay areas (one in each bay), install (4) 20 amp 12 volt single pole switch to operate new exhaust fans, install (2) 700 wire mold drops for existing 20 amp duplex receptacles in computer room #164, reattach and repair (2) data drops and strap existing wire mold raceway, add (3) 20 amp 120 volt duplex receptacles in room #128, replace (160) 1G switch stainless steel covers, replace (60) 1G switch stainless steel covers, replace (40) 10 blank stainless steel covers, and replace (1) 4 wire 30/50 stainless steel covers. Plumbing: Install flush valve repair kits on (7) water closets, and install (2) new 19″ x 17″ Briggs oval lavatories complete with Moen Chateau ADA compliant faucets. Doors: Remove (13) solid core wood doors, install (13) luan solid core wood doors using existing hardware, and install one coat sand and sealer and two coats clear varnish on 13 new wood doors. Roof Vents: Replace (7) vents on roof (4 on Delta and 3 over the kitchen.)

Project Name: Frances Walker Halfway House
Location: Titusville, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2007, $128,506
Project Description: The sewer main was increased in size from 4′ to 6″, two man holes were added, and water line with attachments was added.

Project Name: Pinellas DJJ Fire System Location: Clearwater, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2007, $157,668
Project Description: Replace existing fire and voice evacuation system. Install, wire, trim, program, and test to provide a complete and functioning fire alarm system based on the drawings DJJ supplied us with.

Project Name: Eckerd Halfway House Surveillance
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $41,243
Project Description: Install (2) real time digital video recording archive capacity remote access viewing and recording, (2) 19″ color LCD monitor, (16) Vandal proof high resolution color camera, (1) PC gateway Intel Premium D processor 805, (1) 19″ PC monitor, and (32) reposition/refocus/clean and verify proper operation of all cameras.

Project Name: Collier DJJ HVAC
Location: Collier County, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $32,722
Project Description: HVAC: Install one new three ton split system to compensate for load issues, replace two five ton split systems, including: equipment by Lennox / Trane / Carrier, refrigerant line sets, custom built air handler stands, condensate safeties, re-connect to existing air ductwork on five ton equipment, permanent filter frames, three rolls media, supply and return grilles by Metal-aire I Titus, smoke detectors, phase monitors, pour 4″ concrete slabs for condensers, fence condensers, and seven day programmable thermostats.

Project Name: Wings Generator Location: Miami, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2006, $28,723
Project Description: Portable Generator System Hook up to Building B: Install (1) 400 amp 120-240 volt three phase N3R manual transfer switch, install (1) 400 amp 120-240 volt three phase N3R main breaker disconnect ahead of the “MTS” switch, reroute existing parallel feeders from FPL transformer to new 400 amp main breaker disconnect switch, install (2) 2″ with (4) 4/0 THHN ground from the new main disconnect to new “MTS” switch, and install (2) 2″ conduits with (4) 4/0 THHN and (1) #2 THHN ground from the new “MTS” switch to existing main breaker panel “A”.

Project Name: Falkenberg Academy Cameras Location: Tampa, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $55,000
Project Description: Install (7) night cameras, install (7) outside wall mount dome with surge protection, (2) hard drive DVR, (1) Controller, (16) interior vandal resistant color cameras, (2) 19″ LCD Monitors, (2) 15″ LCD monitors, (3) full body color cameras, (2) 2000va UPS surge protection units, and (3) Auto Iris lens.

Project Name: Eckerd YDC Roof Building #3 & #4 Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $181,596
Project Description: Roof Square Foot Total 11.657: (Fiberlite Roof System) Remove (2) existing roofs down to the gypsum deck, clean up and haul to the landfill, mechanically attach one layer of G-2 base sheet, fully adhere with type 111 asphalt, one layer of Fiberlite Fleece 45 mil membrane, heat welding all seams creating a monolith roof system, fabricate and install new Fiber-Clad metal to the perimeter edge in a drip edge design, fabricate and install new .040 aluminum fascia over wood fascia, field wrap as many penetrations as possible eliminating the need for pitch pans, supply and install new pre fabricated pipe boots to all soil risers, and install details in accordance with all Seaman Corporation, State and Local Codes. Fascia: Remove all rotten fascia, and replace with new pressure treated fascia.

Project Name: Red Road Roofing Project
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $41,409
Project Description: Shingle over existing shingles with 30 year architectural shingles, replace all lead
stacks, flat decks changed to 43 base sheet, 4″ x 4″ galvanized metal eave drip, and cold method modified bitmen for all (6) buildings.

Project Name: Eckerd Youth Halfway House Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $44,680
Project Description: Doors: Remove and replace exterior door, threshold, closer, and hinges, and install new solid core wood door on new HVAC closest. HVAC Closet: Frame up with 2 x 4 wood framing for new HVAC closet, and paint new walls. Window Openings: Window HVAC units to be removed by maintenance at the facility, install 1/2″ plywood on inside of windows attaching to window frames, install 5/8″ drywall over plywood, paint and caulk all new work, and install 1/2″ plywood on exterior side of windows, install 8″ hard plank siding over plywood. Electrical: Terminate one new condenser unit and one new air handler unit in class room area, and install one keyless fixture and one 14 amp single post switch in mechanical room. HVAC: Install one 3 ‘A ton split system. Carpet: Remove existing carpet, install new VCT, and install five coats of wax and burnish last coat.

Project Name: Palm Beach RJDC Sanitation Location: Palm Beach, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2006, $26,366
Project Description: Plumbing: repair damaged sanitary sewer pipe under kitchen/cafeteria wall, repair
damaged sanitary vent pipe at wall between men and women’s gang bathroom, repair wall hung water
closet in B-2 Gang bathroom, and repair lavatory faucet in B-2 holding cell. Catch Basin: Try and locate the catch basin in yard that has evidently been covered up over time and will not let the water from the roof drain out.

Project Name: Everglades Riot Repairs Phase 2 Location: Miami, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2006, $493,184
Project Description: School: Patch holes in walls and ceiling, prime and paint interior, and replace light fixtures damaged during riot. Roof Repairs Maintenance building, replace all fascia boards with new 2 x 10 with 1 x 2 pressure treated strip at top edge (prime and paint all repairs), replacement of rotten 1 x 8 and G roof boards, apply 5/8″ plywood over entire lower roof area to accept new modified rubber roof, and replace soffit with new double 1 x 6 screen vent. Fumigation Razor wire on roofs to be removed for fumigation and to be replaced after the tents are removed. Maintenance Roof Tear off existing shingle and flat roof, dry in with 30 lb felt, install new galvanized flashing, install new 30 year dimensional shingles, flat roof dry in with glass base sheet, hot mop 1 ply IV fiberglass sheet, install new galvanized flashing, and hop mop 1 granular surface modified cap sheet. Kitchen: Remove existing non code fire suppression system and replace new UL 300 fire suppression system to protect hoods and existing kitchen appliances, remove (2) non functional supply fans and (2) exhaust fans, furnish and install new roof curbs over existing curbs, furnish and install (2) new supply fans, furnish and install (2) new exhaust fans 48,000 CFM @ .5 static pressure on roof top, furnish (1) electrical panel for hood lights, fans, and fire suppression, remove lath and plaster ceilings, remove insulation, install 5/8″ drywall on ceiling, and prime coat and two coats finish paint. Panther Building and Classrooms: Re-caulk all batten strips, install missing door trims, tighten all hurricane tie downs, reseal windows as necessary, secure exterior wall to interior walls at portions, replace floors under A/C stands, construct wall supports, replace rotten box still in (4) areas (bracing as necessary), replace (28) sheets of plywood with tile to match, install baseboard in laundry room, repair beam at entrance to room 114, install corner guards on interior columns, and remove and replace drywall behind washing machine. Kitchen: Remove existing non code fire suppression system and replace with new UL 300 fire suppression system to protect hoods and existing kitchen appliances, remove (2) non functional supply fans and (2) exhaust fans, furnish and install (2) new exhaust fans 48,000 CFM @ .5 static pressure on roof top, furnish (1) electrical panel for hood lights, fans, and fire suppression system, remove lath and plaster ceiling, remove insulation, install new R-19 insulation, install 5/8″ drywall on ceiling, and prime coat and two coats of finish paint. Sewer Plant: Reconstruct new roof. Panther Building and Classrooms: Re-caulk all batten strips, install missing door trims, tighten all hurricane tie downs, reseal windows as necessary, secure exterior walls to interior wails at partitions, replace floors under NC stands, construct wall supports, replace rotten box still in (4) areas, brace as necessary, replace (28) sheets of plywood with tile to match, install baseboard in laundry room, repair beam at entrance to room 114, install corner guards on interior columns, and remove and replace drywall behind washing machine. Water Piping Kitchen: Upon removal of the existing ceiling in the kitchen area, we will assess all the piping in the ceiling. We will install new hot, cold, tempered and recirc copper water lines with new type “L” hard copper and fittings. We will install valves in several locations as needed to zone the piping as we will install new piping. Piping sizes vary from 2″ to 3/4″ and will be replaced with same as existing. Kitchen Air Conditioning: Install (2) new 5 ton Bard Air Conditioning package units, and install to include grilles, duct connection, and smoke detectors.Metal Doors and Hardware: (4) hollow metal steel stiffened doors 3′ x 6’8″ x 1 3/4″ 18 gauge, (26) Corbin Russwin heavy duty mortise locks, (5) Corbin Russwin heavy duty cylindrical deadlocks, (23) Corbin Russwin heavy duty cylinders, (12) Hager hinges, (10) pull plates, (1) door closer, (5) thresholds, and all locks set up to new master keyed system. Sewer Treatment Plumbing Repairs: Replace the existing PVC air piping with as needed, replace 1″ galvanized piping as needed, cutting and threading 4″ and 3″ piping as needed, install 16 new ball valves at the pit location, and new uni-strut mounting connections as needed. Fence Repair Admin Building: Straighten out members of fence and reinstall, brace fence in vertical position, and make all concrete repairs to base to secure.

Project Name: Desoto Correctional Facility Roofs
Location: DeSoto, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2006, $468,388
Project Description: Building #55: Install 45 square laminated 30 year composite shingle roof including felt, remove 42 1/4 square laminated 30 year composite shingle roofing including felt, remove 42′/ square single ply .060 PVC membrane fastened, remove and replace 326 feet 1 x 6 #1 Pine fascia, and prime and paint 326 feet exterior fascia. Building #54 Install 44.42 square 30 year laminated composite shingle roofing including felt, remove 41.20 square 30 year laminated composite shingles including felt, remove 41.20 square single ply .060 PVC membrane mechanically fastened, remove and replace 290 feet 1 x 6 #1 Pine, prime and paint 290 feet fascia, and remove and replace 60 feet continuous ridge vent, shingle over style. Building #46: Install 45 square laminated 30 year composite shingle roof including felt, remove 42.25 square laminated 30 year composite shingle roof including felt, remove 42.60 square single ply .060 PVC membrane fastened, remove and replace 296 feet 1 x 8 fascia, and prime and paint 296 feet fascia. Building #45: Install 41.50 square laminated 30 year composite shingle roof including felt, remove 38.75 square laminated 30 year composite shingle including felt, remove and replace 24 feet flashing, remove 38.75 square shingle ply .060 PVC membrane mechanically fastened, remove and replace 3.20 square single ply membrane mechanically fastened, remove and replace 305 feet 1 x 10 trim board, remove and replace 305 1 x 4 trim board, and prime and paint 305 feet fascia/trim board. Building #42: Install 33.50 square laminated 30 year composite shingle roof, remove 31.20 square laminated 30 year composite shingle roof including felt, remove 31.25 square single ply .060 PVC membrane mechanically fastened, remove and replace 9.25 square single ply membrane mechanically applied, remove and replace 242 feet 1 x 1 trim board, and prime and paint 242 feet fascia/trim. Building #37: Install 48.25 square laminated 30 year composite shingle, remove 44.75 square laminated 30 year composite shingle, remove 36.75 square single ply .060 PVC membrane mechanically fastened, remove 44.75 square additional layer of composite shingles, remove and replace 254 feet 1 x 6 #1 Pine, and prime and paint 254 feet of fascia. Building #38: Install 44.75 square laminated 30 year composite shingle, remove 41.55 square laminated 30 year composite shingle, remove 441 square single ply .060 membrane mechanically fastened, remove and replace 267 feet 1 x 6 #1 Pine, prime and paint 267 feet fascia. Building #39: Install 44.75 square laminated 30 year composite shingle, remove 42 square laminated 30 year composite shingle including felt, remove 42 square single ply .060 PVC membrane mechanically fastened, remove and replace 267 feet 1 x 6 fascia, prime and paint 267 feet fascia. Building #41: Install 6.78 square single ply .060 PVC membrane mechanically fastened, and install single ply membrane mechanically attached. Cottonwood: Install 61.25 square laminated 30 year composite shingle including felt, remove 56.25 square laminated 30 year composite shingle including felt, remove 56 square single ply .060 PVC membrane mechanically fastened, remove and replace 68 feet continuous ridge vent-shingle over style. Ironwood: Install 94.50 square laminated 30 year composite shingle including felt, remove 91 square laminated 3D year composite shingle including felt, remove 91 square single ply .060 PVC membrane mechanically fastened, remove and replace 548 feet fascia, remove and replace (2) square single ply membrane mechanically attached. Orangewood: Install 60.25 square 30 year laminated composite shingle roof including felt, remove 58 square laminated 30 year composite shingle including felt, remove 58 square single ply .060 PVC membrane mechanically fastened, remove and replace 407 feet 1 x 6 #1 Pine, remove and replace 407 feet 1 x 6 #1 Pine, prime and paint 407 feet fascia. Revere: Install 96 square laminated 30 year composite shingle roof including felt, remove 93 square single ply .060 PVC membrane mechanically fastened, remove and replace 544 feet fascia, and remove and replace 80 feet continuous ridge vent, and install 82 laminated 30 year composite.

Project Name: Sago Palms Painting
Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $37,011
Project Description: Pressure wash all surfaces to be painted, apply two coats of Astec to be matched to existing color, scrape loose paint, caulk opening seals, and mask to profect glass and hardware, prime rusted metal as needed.

Project Name: Pinellas RJDC Water Heaters Location: Clearwater, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2006, $144,817
Project Description: Furnish materials, labor, heaters, circulation pumps, mixing valves, insulation, pads, heater enclosures, (one for heaters, and one for valves and pumps).

Project Name: Palm Beach RJDC Plumbing
Location: Palm Beach, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2006, $41,680
Project Description: Supply and install 1 Thrush Recirculation Pump- Model #GTV-11-3/4 h.p. with 1 1/2″ suction and discharge- 3 phase electric hook up. This is an exact replacement of the existing pump.

Project Name: South Florida Halfway House Re-Roof
Location: Boca, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $72,202
Project Description: Roof: Front Slope #1 Laminate 30 year composite all inclusive 12.75 square, remove and replace flash parapet wall only 88′, cap flashing 88′, and detach and reset gutter/downspout 27′. Front Slope #2 Laminated 30 year composite all inclusive 18 square, remove and repair flash parapet wall only 71′, and detach and reset gutter/downspout 71: Back Slope Laminated 30 year composite all inclusive 46 square, remove and repair flash parapet wall only 42′, and cap flashing 99′. Back Offset: Laminated 30 year composite all inclusive 3 square, and remove and repair flash parapet wall only 22′. Walkway Laminated 30 year composite all inclusive 2.75 square, and remove and repair parapet wall only 12′. Roof 2-F: Laminated 30 year composite roof all inclusive 9.75 square, remove and repair flash parapet wall only 83′, cap flashing 40′, and remove and repair metal roofing 86 square feet. Second Roof B-2: Laminated 30 year composite roof all inclusive 9.25 square, remove and repair flash parapet wall only 86′, and cap flashing 29′.Second Roof 13-3: Laminated 30 year composite roof all inclusive 10.25 square, remove and repair flash parapet wall only 40′, cap flashing 58′, remove and repair metal roofing 52 square feet.

Project Name: Wings for Life, A and B Remodel
Location: Miami, Florida
Owner: Amikids Wings of South Florida, Inc.
Year Completed/Contract Amount: 2006, $334,838
Project Description: Remodel existing building due to hurricane damages.

Project Name: Eckerd YDC Re-roofing Bldg #80 Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $100,209
Project Description: Fascia: Fascia is made out of metal and we will have to fasten a piece of 2 x 12 wood fascia to the metal fascia for the roofer, and paint the new wood fascia. Roof: Mechanically attach one layer of G-2 base sheet, fully adhere with type 111 asphalt one layer of Fiberlite Fleece 45 mil membrane, heat welding all seams creating a new monolith roof system, fabricate and install new .040 aluminum fascia over the existing wood fascia, field wrap as many penetrations as possible eliminating the need for pitch pans, supply and install new pre-fabricated pipe boots to all soil risers, and install details in accordance with all Seaman Corporation, state local codes.

Project Name: Everglades Youth Center Riot Repairs Location: Miami, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2006, $200,604
Project Description: Remove all door stops and school rooms, repair gas stove, double oven and grille, hook up steamers, and check boiler, install (10) Pelco Dome cameras, install (2) new gas fryers, pad lock all electrical hatches and A/C area, furnish drawings to the state fire marshal so he will allow the facility to open, remove (13) existing lavatory faucets and replace with new Moen Chateau Lavatory faucets, repair urinal flanges in dorm, remove and reset existing water closet in Maintenance Building, cap of existing hot and cold water lines in kitchen area, hook up steamer lines, remove (2) GE lighting control relays at GE lighting contractor panel for dorm lighting, repair steam table at the serving line, repair one 4′ two lamp vapor proof fluorescent strip light in cooler area, repair loose device and cover at freezer door way, repair the dishwasher exhaust fan, repair circuit going to NW wall receptacles that were not working, repair damaged conduit and fittings at (3) 35′ fiberglass poles, repair one cobra head fixture not working, replace (14) 70 watt wall pack fixtures that are not working on the dorm building and cafeteria building, run electric wires to steamers and air curtains, replace (60) pieces of white baseboard tile, replace (60) pieces of white wall tile, remove fuel lines, eliminate day tank, change oil and filter, IBG assembly, IBG rain cap, remove ceiling and insulation that is full of mold, re-use light fixtures, replace rotten wood floor using pressure treated plywood, repair (30) outside corners of damaged tile, install 48″ stainless steel outside corners, paint (3) bathroom ceilings, wash, prime two coats semi-gloss, paint interior of boiler room, replace floor tile at serving line, install 100′ stainless steel o/s corner on knee walls, install (15) stainless steel kick plates, replace (8) relay modules, and replace (2) batteries.

Project Name: Eckerd YDC Roof Bldg #87 Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $90,319
Project Description: Roof : There are 73 S.F. of roofing in this building that will be replaced; mechanically attach one layer of G-2 base sheet, fully adhere with Type 111 asphalt, one later of Fiberlite Fleece 45 mil membrane, heat welding all seams creating a monolith roof system, fabricate and install new fiber-clad metal to the perimeter edge in a drip edge design, fabricate and install new .040 aluminum fascia over the existing wood fascia, field wrap as many penetrations as possible eliminating the need for pitch pans, supply and install new pre-fabricated pipe boots to all soil risers, and install details in accordance with all Seaman Corporation, state and local code requirements. Fascia: Replace rotten wood fascia with new wood, there is 422′ of fascia, and there is 1,266 square feet of soffit.

Project Name: Eckerd YDC Roof Bldg #80
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $234,033
Project Description: Fascia: Fascia is made out of metal and we fastened a piece of 2 x 12 wood fascia to
the metal fascia for the roofer, and painted the new wood fascia. Roof: Mechanically attach one layer of G-2 base sheet, fully adhere with type 111 asphalt one layer of Fiberlite Fleece 45 mil. Membrane, heat welding all seams creating a monolith roof system, fabricate and install new Fiber-Clad metal to the perimeter edge in a drip edge design, fabricate and install new .040 aluminum fascia over the existing wood fascia, field wrap as many penetrations as possible eliminating the need for pitch pans, supply and install new pre-fabricated pipe boots to all soil risers, and install details in accordance with all Seaman Corporation, State and local codes.

Project Name: Eckerd YDC Roof Bldg #33 Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $56,889
Project Description: Fascia and Soffit: Minimal soffit and fascia repair. Roof: Mechanically attach (1) layer of G-2 base sheet, fully adhere with Type 111 asphalt, one layer of Fiberlite Fleece 45 mil. Membrane, heat welding all seams creating a monolith roof system, fabricate and install new .040 aluminum fascia over the existing wood fascia, field wrap as many penetrations as possible eliminating the need for pitch pans, supply and install new pre-fabricated pipe boots to all soil risers, and install details in accordance with all Seaman Corporation, and State and local code.

Project Name: Eckerd Int. Halfway House Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $51,918
Project Description: Northwest Corner Well: Pull out the old turbine and dispose of it, acid treat the well screen and air develop it until the well is free and clear of sand, install a 10 horsepower submersible pump. Northeast Pump: Pull the pump, air develop it, clean the screen, and install the existing pump back into the well. Deep Flowing Well: Pull the turbine out, replace the pump, and install special head due to the artesian flow. Fans: Install (2) exhaust fans on gym.

Project Name: Sewer Line Engineering Eckerd Youth Facility Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $66,188
Project Description: Camera: CCTV inspections of all main sewer system lines, multiple lift stations, all
manhole to manhole runs, Omini Eye will video inspect all main sewer lines (approximately 19,000′) within the sewage collection system, all sewer lines will be swept clean of man made debris and paper in preparation for thorough CCTV inspection. Removal of sand and debris is not included in this preparatory sweep cleaning, inspect sanitary sewers, confirm locations of existing lines, and document sizes, materials and faults. Surveyor: Task One Asbuilt Survey of Water Distribution- Utilize a subcontractor that will provide ground penetrating radar providing depth to the existing ductile iron pipe. Verify depths provided by radar and we will provide accurate state plane coordinates measurements and NGVD elevations along the existing water lines. Shots will be taken at intervals of 100 feet MIL along the water line and at each tee fitting and or directed by the Project Engineer. Provide an asbuilt survey of the above services and delineate the asbuilt system on a recent acquired aerial ortho image. The asbuilt survey will be in compliance with the Florida minimum technical standards on surveying and mapping. Task two Asbuilt survey of Sewage Collection System: Prove asbuilts for the total vitrified clay pipe Lift 18,508′, sanitary sewer manholes 76, and stations(2).

Project Name: Palm Beach RJDC Compressor Location: Palm Beach, Florida
Owner: Regional Juvenile of Department Center
Year Completed/Contract Amount: 2006, $26,218
Project Description: Compressor: Remove and replace defective 80 to compressor on Trane chiller, and factory start up was included.

Project Name: Eckerd Halfway House Camera Service Call Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $8,941
Project Description: Camera Service Cali: Service call to diagnose, analyze, test, set up, and configuration
of camera system, including two technicians for 16 hours. Concertina Wire: Remove existing concertina wire around the fifty bed facility. Remove it, roll it up, and give it to the facility for them to store.

Project Name: Eckerd YDC Roof Building #16
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $174,859
Project Description: Fascia and Soffit: Minimal soffit and fascia repair. Roof: Mechanically attach (1) layer of G-2 base sheet, fully adhere with Type 111 asphalt, one layer of Fiberlite Fleece 45 mil. Membrane, heat welding all seams creating a monolith roof system, fabricate and install new .040 aluminum fascia over the existing wood fascia, field wrap as many penetrations as possible eliminating the need for pitch pans, supply and install new pre-fabricated pipe boots to all soil risers, and install details in accordance with all Seaman Corporation, and State and local code.

Project Name: Collier Boys Phase II Location: Tampa, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2006, $88,140
Project Description: Remove and install new equipment: (2) 6.5 ton, (1) 4 ton, and a classroom building. General Repair: repair VCT in control room, touch up paint and minor repair on interior, replace one cell wood cell door, remove old washers and dryers, replace with heavy front load, two washers, and dryers, install new soffit on classroom, repair soffit on main building, replace all missing shingles, and pressure wash exterior of buildings. Cleaning: Perform janitorial services on the facility, strip, seal, and wax 8,199 S.F. VCT.

Project Name: Palm Beach RJDC Chiller & Tower Location: Palm Beach, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2006, $92,843
Project Description: Controls: Furnish and install stand alone control system on (12) central air handler stations. Certified Test & Balance: Complete test and balance on air and water as per original design. Service: Perform full service on existing chiller and water tower.

Project Name: Palm Beach RJDC Improvement Location: Palm Beach, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2006, $221,753
Project Description: Cameras: Install (2) real time digital video recorders with remote access, and viewing and recording, (2) LCD monitors, (27) vandal proof high resolution day/night color dome cams, and labor. Acid ETCH Tile: acid etch (3) shower areas, and install epoxy coating on (4) shower areas, acid wash all terra cotta tile throughout the facility (cells, staff bathrooms, kitchen entrance, laundry room, and intake bathrooms). Ceiling Tile: replace ceiling tiles in the dining room area, and replace ceiling tiles in the multi-purpose room. HVAC: replace (6) air handlers, (4) four ton chilled water air handlers, (1) 7.5 ton chilled water air handler, and (1) 10 ton chiller water air handler, and replace air handler motor in kitchen. Doors: remove and replace approximately the bottom 1′ of jamb legs on (15) doors, replace 32″ solid core wood door on old lunch room, replace (2) doors in kitchen receiving area, and replace doors in kitchen receiving area, and replace door side light in Mod 4. Bathroom Partitions: new brackets on all bad portions, and six new partitions that will be picked up from Eckerd Youth Development in Okeechobee. Sky Lights: remove and replace (6) sky light Plexiglas panels in holding cells. Cleaning: clean walls in dining room & re-caulk, and re-wax VCT floors. Electrical: replace (12) 2′ x 2′ light fixtures, install (12) 2′ x 2′ light fixtures, replace all 2 x 4 and 2 x 2 fixtures in the isolation room. Recreation Area: level existing dirt work with bobcat and install Bahia sod inside fenced area, remove basketball goals, install (2) new basketball goals, install 1″ asphalt over entire existing basketball court, and stripe the new asphalt for basketball play. Ceramic Tile: replace newly installed rubber baseboard with the same ceramic tile base used in administration, and install new ceramic tile base in the dining area. Fencing: replace rusted top and bottom rails at facility.

Project Name: Palm Beach RJDC Compressor Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $26,218
Project Description: Remove and replace defective 20 ton compressor on Trane chiller. Factory startup included.

Project Name: Palm Beach RJDC Duct Work Location: Palm Beach, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2006, $39,369
Project Description: Remove all existing supply and return air duct work on (10) air handling units, install new duct work in all mechanical rooms to be tied into existing duct work, and sanitize all existing duct work.

Project Name: Sago Palms Roofing Bravo Location: Pahokee, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2006, $52,460
Project Description: General Scope on Buildings: Prior repairs will be removed, termination bars removed, cleaned, replaced, and waterproofed, where standing water caused by prior repairs has caused rust at the seam to cover above and below the cleaned and primed and a patch will be installed at the seam to cover above and below the seam and the patch will be waterproofed, the ridge cap will be replaced where needed, application of Astec system will be done according to ICC specifications, all loose screws will be tightened and self tapping screws will be installed to replace missing screws and to close open seams, the roof will be pressure washed to remove all dirt and debris, Astec # 4000 Surface Conditioner will be applied to the entire area, Astec Rust Inhibitor will be applied to all corroded surfaces, all roof fasteners will be covered with Astec Waterproof Membrane, all seams will be tightened as neede and caulked or treated with WPM #10, stack areas and other penetrations will be coated, and reinforced with Astec Polycloth or WPM #10 to waterproof and add tensile strength, Astec Ceramic Finish coat will be applied to entire roof at DFT of 12 mils., Astec Coatings are warranted for 10 years. Bravo Building: Remove prior repairs, clean termination bars, replace ridge cap where damaged, install patches at seams where needed, and application of Astec System.

Project Name: Palm Beach RJDC Boiler Phase 2 Location: Palm Beach, Florida
Owner: Regional Department of Juvenile Justice Year Cornpleted/Contract Amount: 2006, $73,929
Project Description: Replace all ceiling tile in the kitchen area, replace (7) exterior metal doors, jambs,
hardware, thresholds, security locks self when door shuts, replace (3) light fixtures in shower area, remove carpet from hallway in administration, install new ceramic tile in hallway of administration, remove existing VCT from dining area, prep floor, install new VCT, remove damaged HVAC duct in kitchen, install new HVAC duct in kitchen, clean entire building, re-wax all existing VCT floors, and clean (3) rooms with carpet.

Project Name: Palm Beach RJDC Boiler Pipes
Location: Palm Beach, Florida
Owner: Regional Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $176,252
Project Description: Remove all old chiller pipe and mold infest insulation on piping, install schedule 40 cold water chiller pipe with 1″ foam insulation jacket encapsulated with ultra violet jacket from chiller pump unit to all (8) chill water air handler units, paint Kiltz over mold areas in hallway, replace ceiling tile and grid in kitchen area 4′ x 10′ that is molded and rusted, replace (3) exterior metal doors, jambs, hardware, thresholds, security locks self locking when doors shut, replace approximately (60) pieces damaged ceiling tile, repair sallyport gate, replace drywall under vanity sink that has been removed, and replace pieces of tile in shower and laundry room that is missing or damaged.

Project Name: Polk RJDC Storage Shed
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $68,960
Project Description: Remove (2) existing storage sheds. Build a new (30′ x 50′) storage shed. Concrete foundation, CBS walls, and wood truss roof.

Project Name: Polk RJDC Flooring
Location: Bartow, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2006, $34,964
Project Description: Mode 1 & 5- Remove existing carpet and ceramic tile. Install ceramic tile throughout. New tile to be 6 x 6 and slip resistant.

Project Name: Sago Palms Academy Mold Location: Pahokee, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2006, $228,705
Project Description: Perform a complete mold remediation and tear out damaged compromised materials above and beyond the remedial protocol provided by the testing agency report that was supplied to us by the Department of Juvenile Justice. We are to seal all surfaces after the cleaning. We will induce bacterial cleaning agent through the NC duct systems, and replace damaged and removed material with similar material.

Project Name: Florida Institute for Girls Fencing
Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $82,648
Project Description: Have licensed surveyor establish boundary lines. Supply two certified copies, determine number of trees on boundary line, remove trees that interfere with the erection of the fence, remove all debris at job location, install 980′ of 10′ high chain link fence with three strands of barbed wire on top, fence will be four sides, 250′ on each side and 240 ‘ in rear and front. There will be two gates, one 3′ gate at walkway on South side of the office and living building, one 4′ gate at walkway by kitchen on North side of property, and fence will be set on inside of sidewalk.

Project Name: Eckerd 50 Bed Fencing
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $4,379
Project Description: Extend gate posts and add stationary transom to top of gate at 50 bed consequence unit.

Project Name: Polk RJDC Conference Room Addition
Location: Bartow, Florida
Owner: Regional Juvenile Department of Justice
Year Completed/Contract Amount: 2006, $370, 400
Project Description: Add onto existing conference room (40′ x 50′). New addition to include slab, walls, roof, electrical, HVAC, plumbing, and interior finishes…etc.

Project Name: Sarasota Probation Office Location: Sarasota, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2005, $104,369
Project Description: Two Offices in Back Room: Remove all wood shelving racks in bathroom, install 2 x 4 wood frame or metal walls to make two 8′ x 13′ offices, install 3 %” insulation in all new walls, install drywall and finish on all new framed walls, on the existing plywood walls we will put a knockdown finish so it all looks the same on the inside of the offices, install a new drop ceiling in each office, install a new hollow core pre-hung door in each office, install one four tube 4′ fluorescent light fixture in each office with one switch per light, install (3) duplex receptacles in each office on each wall, paint will be eggshell white on walls with doors a light brown, install carpet on the floor in each office, install a vinyl cove base, and install (3) two tube 4′ fluorescent light fixtures in corridor with two three way switches at each end of new corridor. Single Office in Back Room: Remove existing wood shelving units, install 2 x 4 wood frame walls to make a 10′ x 15′ office, install drywall on all interior walls, insulate the new walls, add (2) four tube fluorescent light fixtures with one switch, add (3) duplex receptacles and three interior walls, remove existing disconnects and all other electrical wiring left from existing exhaust fan on back wall, install new door in office that leads into machine room, and remove metal duct from exterior wall and cover up the hole with existing metal on site. Two New Offices in Server Room: Add one office 8′ x 11′, add one office 8′ x 12’6″, remove existing door from server room, add walls with door around existing server, add switch circuits for the lights in offices, all new walls to be insulated with drywall, all walls and doors to be painted, close in existing door opening going into storage room, and no new flooring- carpet is to remain as is. Conference Room: Remove all triple awning window, and install a fixed impact resistant glass and frame back in the same opening. Glazing to have 25% block out. Existing Break Room: Cut a hole in the existing wall that will be 6′ wide x 3′ high, trim out the hole with a 1 x 6 jamb and install casing on both sides, paint the new trim light brown, and relocate the dedicated circuit from the copy machine into this room. New Break Room: Remove (2) existing walls, cut the carpet out square and patch floor with VCT, remove existing shelves, remove hard ceiling and replace with new drop ceiling, install (2) 6′ base cabinets with countertops, install one set of 6′ upper cabinets, remove existing disconnects and all other electrical wiring left from exhaust fan on back wall, install new door in office that leads into machine room, and remove metal duct from exterior wall and cover up the hole with existing metal on site. Two New Offices in Server Room: Add (1) office 8′ x 11′, add one office 8′ x 12’6″, remove existing door from server room, we will need to move some existing lights, add switch circuits for the lights in office, insulate all the new walls with drywall, paint all the walls, re-paint existing wood walls in the two new offices, close in existing door opening going into storage room, and no new flooring will be installed. Conference Room: Remove the triple awning window, and install a fixed impact resistant glass and frame back in the same opening. Existing Break Room: Cut a hole in the existing wall that will be 6′ wide x 3′ high, trim out the hole with a 1 x 6 jamb and install casing on both sides, paint the new trim light brown, and relocate the dedicated circuit from the copy machine into this room. New Break Room: Remove two existing walls, cut the carpet out square and patch floor with VCT, remove existing shelves, remove hard ceiling and replace with new drop ceiling, install (2) 6′ base cabinets with countertops, install one set of 6′ upper cabinets, remove an existing electrical outlet and try to get it back in the wall, remove one 4′ shop lite and install a new four tube 4′ fluorescent light, and add a new door in women’s restroom, Parking Lot: Paint in a new handicap parking spot, and patch holes in the parking lot. HVAC: Replace 15 ton air handler and install as need duct and diffusers supply and return through out building to insure balance. The new offices mentioned above will either be connected to this new 15 ton air handler or a new split unit sized for the new space will be installed paralleling the 15 ton new unit.

Project Name: Polk RJDC Fire Sprinklers
Location: Pahokee, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2006, $100,923
Project Description: Cut back (114) side-wall heads, replace (7) side-wall heads & plates, cut back (65)
pendent heads, replace (14) pendent heads & plates, replace (29) pendent cone plates, secure all cut-back heads with retainer flanges or riser clamps.

Project Name: Sago Palms Sprinklers
Location: Pahokee, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2006, $73,459
Project Description: Fire Sprinkler: Cut back (114) side wall heads, replace (7) side wall heads and plates,
cut back (65) pendent heads, replace (14) pendent heads and plates, replace (29) pendent cone plates, and secure all cut back heads with retainer flanges or riser clamps. Patch Walls: After the fire sprinkler company has finished we will go in and patch the block walls around the pipes and clamps that have sustained damage.

Project Name: Polk RJDC Door Interlocking System Location: Bartow, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2005, $12,000
Project Description: Install door with interlocking system at both the intake and lobby vestibules. System to be card access type.

Project Name: D.J.J. Juvenile Assessment Center Renovations
Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2005, $182,702
Project Description: Pressure clean and paint the exterior of the entire building using latex paint, prep and paint walls, doors and ceilings in the rooms 168, 201,151,156,161,and 206. Build a partition wall approximately 15′ long with an access door, existing VCT flooring to remain, and acoustical ceiling repairs to be made at new wall. Replace bulbs, repair, or replace as necessary to have all lights functioning properly. Remove and dispose of room signs (ones including wording), and add or change any room numbers that are incorrect or missing. Install commercial grade carpet over existing VCT tile throughout the remodeled areas with the exception of the bathrooms, equipment rooms, and room 178. Exterior entry camera wire to room 210 and tie-in to existing monitoring system. Install a door buzzer and bell in Room 182. Also install a switch to turn off buzzer. Install an electronic door strike on door 56 in room 194. The strike shall be operated from offices 170, 171 and room 178, Install panic hardware. Door E46 remove mag. lock and install new door threshold. Re-key all rocks within our remodeled areas. Install landscaping at front entry. Replace keyed light switch with a standard type in all of the rooms. Install a phone jack in room 184. (In rooms .168, 169, 170, 171, 172, 173, 174, 177, 178, 191, 192, 193) install a light switch in all of the rooms listed with the exception of 172 and 173. Install (2) duplex outlets in all of the above rooms, install a phone/data jack in all of the above rooms with an exception of 174. Replace keyed light switch with standard types in room 172 and 173. Install two duplex outlets between upper and lower cabinets in room 174. Remove existing recessed lights and install (2) 2×4 florescent lights in rooms 175 and 177. Install a third duplex outlet for CCTV monitor in rooms 170 and 171. Rooms 185- install a phone/data jack in the West end of the North wall. Room 186- Install plastic coated wire ventilated shelving. Room 182- Replace keyed light switches with a standard type, remove cabinetry, remove sink and cap plumbing, terminate all CCTV intercom and electrical wiring, remove counter top, and emergency generator annunciators to remain in existing room. Room 206- Replace keyed light switch with a standard type, and install a phone/data drop. Rooms 176, 183, and 194- Replace keyed light switch with a standard type. Rooms 179- Install a duplex outlet on the exterior of the North Wall. Room 179- Install a duplex outlet on the exterior of the North wall. Rooms 195,196,197 and 198- (3) bathrooms, (1) shower room- paint.

Project Name: Polk RJDC Control System
Location: Bartow, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2005, $152,400
Project Description: Replace the existing multiplexers and time lapse VCRs with digital recording and
switching devices (Kalate! DSR-2000e-80 digital recorders with 80 GB storage or equivalent). There should be enough for 1 week’s storage of data. Install computer to be used as a download/review station, install CD writer for backup storage, miscellaneous parts for installation, and training. Remove and replace work counter cabinetry, and CCTV racks.

Project Name: Sago Palms Roofing Location: Pahokee, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2005, $42,573
Project Description: Remove prior repairs, clean termination bars, replace ridge cap where damaged, install patches at seams where needed, and application of Astec System.

Project Name: Everglades Youth Camp
Location: Miami, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2005, $181,648
Project Description: Cafeteria, Multipurpose, #2, and Master Control: Tear off existing shingle roof, dry in 30 lb. of felt, install new 3″ x 3″ galvanized drip edge and new lead flashing, and install 40 year dimensional GAF shingles. Woodwork: Frank Cummins, Inc. has looked at the roof and the following is their scope. We will inspect all roof sheathing and replace as necessary. We will also brace any deteriorated framing members to ensure the strength of these members is correct. We will renail any loose plywood to conform to today’s code, 4″ on center at edges and 6″ in the field. We will make fascia board repairs. We will install new continuous screen vents on all buildings, remove and reframe all old roof vents that are to be removed, replace any rotten T1-11 gable end plywood, prime and paint with one coat. Replace gable end roof vents to ensure proper venting, and repair two large vents on cafeteria roof and do the sheath metal work required.

Project Name: SFWM Roof & Porch Repair
Location: West Palm Beach, Florida
Owner: South Florida Water Management
Year Completed/Contract Amount: 2005, $6,770
Project Description: Remove existing 5V crimp roofing from 36′ x 84′ barn, and replace with new 26-guage 5V crimp roofing.

Project Name: Collier DJJ HVAC Location: Immokalee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2006, $32,772
Project Description: HVAC: Remove existing 4 ton HVAC unit, and install a new 4 ton HVAC unit. Drywall: Tear out existing damaged drywall in A/C closet, office area, and bathroom, install new drywall in three rooms listed above, and paint all new drywall. Flooring: Remove existing damaged carpet from NC closet, office area, and bathroom, and install new VCT tile in the three rooms listed above. Cleaning: Clean up all three rooms after all the work is finished.

Project Name: Hillsborough RJDC Fencing
Location: Hillsborough Beach, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2005, $26,582
Project Description: Fencing: Add concertina to existing fence; remove and dispose of two rows of (1000 If each row), of existing 18″ razor ribbon, replace with two rows (1000 If each row), of 30″ concertina wire fastened to the fence. Add Fence at East Annex Entrance; Add 25 If of 9′ high fence including one 4′ wide pedestrian gate including electric lock. Lock shall be keyed both sides for manual operation as well as electrically operated. Power and control to lock by others. Add fence at West annex entrance; Add 20 If of 10′ high fence with chain link roof including on 4′ wide pedestrian gate including electric lock. Lock shall be keyed both sides for manual operation as well as electrically operated. Power and control to lock by others. Add Cattle Chute from E-1 Mod to E-2 mod rear of building; Add 490If of 8′ high 7′ wide cattle chute with chain link roof, including four single gates on row of 30″ concertina wire on top of chute. Included is a 4″ thick concrete sidewalk, and a 6″x12″x165 if high curb to act as a retaining wall.Add Chain Link Roof at Existing E-1 Yard: Add chain link roof to enclose existing 13′z35′ yard, attach to existing 12′ high fence and to building. Add Chain Link Roof at existing E-2 Yard; Add 15 If of 12′ high fence with one gate, and add a 15′ x 21′ chain link roof to enclose yard, attach to existing 12′ high fence to building (gate to have hasp for padlock only).

Project Name: Eckerd Intensive Half Way House HVAC
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2005, $44,680
Project Description: Halfway House HVAC Replacement: Install (2) Goodman 4 ton 13 seer package units, installation includes: curb adapter, duct housing, thermostats, reconnect to existing electric, anchor unit #1 to the curb, anchor unit #2 to the slab, reconnect to existing duct, and drain line. Halfway House Administration Building: Install 3.5 ton 13 seer split system, install exposed metal duct, concrete slab 4″ thick, line sets, condensate lines, thermostat, air handler stand. Change out existing 2 ton split system; install two mini ductless air conditioning units in office area, line sets, concrete slab 4″ thick, and condensate lines. Halfway Administration Electric: Install (1) 60 amp 220 volt circuit for new 3 % ton air conditioning, hook up new 3 1/2 ton AHU and CU, install (2) 20 amp 200 volt circuits for two mini split air conditioning systems, and hood up two mini split condenser units and two fan coils.

Project Name: Desoto JCF Building Utilities
Location: DeSoto, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2005, $36,623
Project Description: Remove and replace (13) gas vents, install cricket/curb at (4) exhaust fans, remove and replace ridge (end cap) and (1) piece of rake metal at the North end, remove and install all rake metal on the Northeast half of the building (install new butal tape), remove and replace 400 S.F. of roof insulation at the Northeast corner, remove and replace (1) downspout on the East side of the building, remove and replace roof panels and accessories.

Project Name: St. Lucie RJDC Portables
Location: Port Saint Lucie, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2005, $134,252
Project Description: Fencing: Remove and reinstall approximately 20′ of chain link fencing and one 12′ gate, and remove and reinstall approximately 24′ of chain link fence. Cameras: Remove equipment, terminate and isolate cables from portables, upon replacement of portables we reran cables as necessary and reinstalled equipment. Electric: Unhook existing electric from existing portables, reinstall existing electric back to new portables, install a new phone line to the two new portables, and ground units per code. Demolition: Remove existing portables to the area specified by the state, and clean up debris. Portables: Install a new 24′ x 50′ portable, and install a new 24′ x 36 portable. Steps and Rails: Both new portables will receive new PT wood steps with landing and rail.

Project Name: Sarasota D.O.E. Building
Location: Sarasota, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2005, $19,898
Project Description: Remove Brush: Remove overgrown brush from building, and trim palm tree on the
South side of the building. Pressure Clean: Pressure clean all side walls of building. Repair Hole In Wall: Repair hole in wall on South side of the building, repair porch fascia and ceiling, and caulk around bottom of the building. Vertical Blinds: Install vertical blinds in conference room, and install vertical blinds on side lights of entry door. Storage Room: Install walls in storage room, install one 3′ door, install ”/z’ plywood on walls, install drop ceiling, remove existing lights, and install lights after drop ceiling has been installed.

Project Name: Brevard RJDC Flooring
Location: Titusville, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2005, $17,658
Project Description: Main Hall: Remove existing sheet linoleum, level concrete floor as required, install new VCT tile, install new 4″ cove base, and approximate dimensions- 81’6″ x 8′. East Mod: Remove existing VCT tile and sheet linoleum, level concrete floor as required, install new VCT tile through out mod, and install new 4″ base. West Mod: Remove existing VCT tile from common area, level concrete floor as required, install new VCT tile in common area, install new 4″ cove base. North Mod: Remove existing VCT tile from common area, level concrete floor as required, install new VCT tile in common area, and install new 4″ cove base.

Project Name: Seminole RJDC Generators
Location: Okeechobee, Florida (Brighton Reservation)
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2005, $155,400
Project Description: Provide and install (1) 150 KO generator with an 800 gallon diesel fuel tank, (1) 400 AMP 120-208 volt automatic transfer switch, circuit generator panel, (3) conduits, re-route sub-feeders to generators, load bank test, and form and pour 10′ x 18′ x12″ concrete pad for generator to sit on.

Project Name: Seminole RJDC Windows and Guttering
Location: Okeechobee, Florida
Owner: Seminole Tribe of Florida (Brighton Reservation)
Year Completed/Contract Amount: 2005, $75,561
Project Description: Install downspouts and guttering to carry the water away from the building. Also repair foundation block to close the mortar joints and waterproofed to ensure protection against further water damage. Replace window casements and lexan to stop the water from going into the building.

Project Name: Polk RJDC Generators
Location: Bartow, Florida
Owner: Regional Juvenile Detention Center
Year Cornpleted/Contract Amount: 2005, $139,544
Project Description: Electric: Provide and install (1) 150 KW generator with 800 gallon diesel fuel tank (72 hours of operation), provide and install (1) 400 amp 120-208 volts, and form and pour 10′ x 18′ x 12′ concrete pad for generator to sit on 3000 PSI concrete.

Project Name: Manatee RJDC Generator
Location: Bradenton, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2005, $182,334
Project Description: Generators: Provide and install (1) 300 KW generator with 1650 gallon diesel fuel tank (72 hours of operation), provide and install (1) 800 amp 120-208-volt three phase “WYE” NEMA 3R Automatic Transfer Switch, provide and install (1) 800 amp 120-208-volt three phase “WYE” NEMA 3R main disconnect ahead of ATS for power company feeders, install (2) 3″ conduits with (4) 500 MCM THHN from 300 KW generator to ATS rack, install (2) 3″ conduit with (4) 500 MCM THHN from existing MDP to ATS rack, provide a temporary generator and connect to existing 800 amp “MDP” to operate facility when new ATS switch and power company feeds are installed, and remove existing 15 KW generator system and ATS from inside of main electrical room to outsides service area for pick up and transport by others to return to DJJ. Concrete Pad: Form 10′ x 18′ pad 12″ thick, install two layers of 5/8″ rebar on 6″ centers, and pour 3000 psi concrete for generator pad. Shed: Move existing shed out of the way to do the work on generator, and reinstall shed.

Project Name: Dade RJDC Phones
Location: Dade County, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2005, $14,575
Project Description: Install new phone system.

Project Name: Martin High Risk Facility
Location: Martin County, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2005, $42,882
Project Description: Survey: Survey swale across 25′ and stake every 50′, and draw as-builts when completed. Rework Swale: Install silt fence, grub areas of swale, haul and place full as per plans in limits of work, reshape swale as per plans in limits of work approx 25′ wide by 820′ long. Sod: Install bahia dos in reworked swale.

Project Name: Everglades Youth Facility Modular Removal
Location: Dade County, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2005, $27,832
Project Description: Electrical: Disconnect the power to the modular building to be removed, remove conduit and wire at the modular unit, and disconnect the frame grounds. Plumbing: We shall disconnect sanitary and water piping from three portable trailers, and cap off existing sewer and water lines to each trailer. Dumpsters: Supply (8) dumpsters for the modules to be put in once they are demolished by the Department of Corrections.

Project Name: Okeechobee Juvenile Center
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2005, $34,268
Project Description: Repair damages to existing building.

Project Name: Southwest Detention Chiller
Location: Lee County, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2004, 5119,794
Project Description: Replace Owner Supplied Chiller: Provide all labor and material to replace one water cooled McQuay chiller with owner supplied Trane air cooled chiller. Work to include: New concrete structure, new PVC chilled water piping, vibration isolators, isolation valves, new electric and breaker, 1 foam glass insulation, core drilling, removal and disposal of old cooling tower and chiller, set existing generator on DJJ supplied trailer, Ballards to protect the new chiller, and start up the chiller.

Project Name: Palm Beach RJDC Plumbing
Location: Palm Beach, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2004, $41,680
Project Description: Camera: Plumber ran the camera down the main line of underground plumbing for 20′ at six different drain locations. Air Sponge: Purchase and deliver to the facility (2) 8 OZ 5 packs of Environmental Air Sponge. Duct Test: Okeechobee Air Conditioning sent Marcell LaRose to the facility to do a test on the duct in the main lobby and the administration room. Smoke Test: Echols Plumbing completed a smoke test of the facility which showed approximately 35 leaks in the old plumbing fixtures, and smoke test after plumbing work done to show if any leaks were missed. Plumbing: Repair defective plumbing in various locations- kitchen area G-1 module, detention cells G-1 module, detention cells B-1 module, gang bathroom B-2 module, public gang bathroom women’s side, and private bathroom kitchen on the women’s side. Ceramic Tile: After the plumber has fixed leaks in the drain at the floors we will fill holes with concrete and replace the ceramic tile with as like match as possible. Exterior Can Wash: Remove and install new drain, piping, and can wash.

Project Name: St. Lucie RJDC Unit # 1
Location: Port Saint Lucie, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2004, $86,799
Project Description: Fencing: Remove chain link fencing so portable can be removed, and install chain link fencing after new portable are set. Plumbing: Unhook existing plumbing from existing portable, and hook existing plumbing back to new portable. Electric: Unhook existing electric from existing portable, and reinstall existing electric back to new portable. Demolition: Remove existing portables. Portable: Install new 24′ x 50′ portable.

Project Name: Orange Halfway House
Location: Orlando, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2004, $7,091
Project Description: Remove existing vent-a-ridge damaged in storm and replace with aluminum vent-a-
ridge, approximately 400 feet.

Project Name: Osceola RJDC Repairs
Location: Osceola County, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2004, $14,659
Project Description: CCTV Repair: Emergency repair of video surveillance and MT1 board. Roof, Fascia, and Soffit: Replace missing shingle tiles, replace missing and damaged fascia, and replace missing soffit and reinstall hanging soffit.

Project Name: Florida Institute for Girls
Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2004, $50,814
Project Description: Furnish and install: (4) 16 Port Digital Multiplex Recorders (Dedicated Micros), (1) 21″ High Resolution Digital Video Monitor, (42) Color Mini Dome High Resolution Video Surveillance Cameras, (3) Rolls Multifunction Video Cables with BNC, (48) AC-DC Power Supply Unit with Power Surge Protection, and Re-Power Trigger Capabilities.

Project Name: Osceola RJDC Charley Repairs
Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2004, $163,492
Project Description: Repair damages to existing building due to hurricane.

Project Name: Broward Halfway House Generator
Location: Broward County, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2004, $109,798
Project Description: Generator: Install (1) 10′ x 15′ x 12″ concrete slab with double mat of #5 rebar for new generator to sit on, remove existing 50KW 120-208 volt three phase automatic transfer switch, provide and install one 800 amp 120-208 volt three phase N3R main breaker enclosure with one 3P800 amp main breaker for new service disconnected ahead of new “ATS”, install two 4″ conduit with four 300 MCM THHN from FPL pad mount transformer to new service disconnect at building, install two 4″ conduit with four 600 MCM THHN and one #1/0 THHN ground from new “ATS” to existing “MDP” panel, install two 3″ conduit with four 350 MCM THHN and one #2 THHN ground from new diesel generator to “ATS”, install one 1″ conduit with three #12 THHN from panel A to new diesel generator for battery charger, load and transport one 150kw 120-208 volt three phase diesel generator from Everglades DJJ facility to Broward County Halfway House, set 150kw diesel generator in place and anchor to new concrete slab, provide one four hour load bank test on diesel generator, and provide on diesel fuel fill up for load bank test and operation.

Project Name: Palm Beach RJDC 45″, Street Duct Work
Location: Palm Beach, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2004, $39,388
Project Description: Duct Work: Remove existing supply and return air duct work on ten air handling units, install new duct work in all mechanicals room to be tied into existing duct work, and sanitize all existing duct work.

Project Name: Palm Beach R.J.D.C. Relocate Orders
Location: Palm Beach, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2004, $22,915
project Description: Relocate Recorders: (28) new cable runs to Superintendents Office (16 per unit
4-2+2+2), (1) miscellaneous BNC connectors / trunking I barrel connectors /tie straps / cable clamps I wire retainers, (1) 4 port router to connect systems / remote access, (2) dimension multimedia PC 17″ flat panel monitors for master control for users to view and control cameras. Plumbing: Supply and install (1) Wilkens 975-2″ backflow replacing existing 2″ backflow, connect, test, and re-certify. Lexan Dorm #3: Remove and security bars and lexan from the following exterior openings and install new lexan and replace the old security bar, and interior openings.

Project Name: Peace River Outward Bound Repair
Location: Arcadia, Florida
Owner: Florida Department of Juvenile Justice
Year Completed/Contract Amount: 2004, $89,790
Project Description: Main Administration and Dorm: Replace 8″ fascia damaged in storm, replace vented soffit damage in storm, replace J-Channel damaged in storm, replace insulation removed during storm, replace A/C duct water damaged in storm, replace shingles blown away in storm, defective fire equipment
being replaced- (3) Edwards 24335P duct detectors with test switch, (1) Wheelock weatherproof outside
hem/stroke, (1) Wheelock 6″ weatherproof bell for sprinkler notification, replace (3) batteries for Astalite exit lights, all other misc. equipment and material to install above, and testing of system for proper activation. School: Replace shingles blown away in storm, and replace A/C duct water damaged in storm. Storage: Rescreen soffit. Kitchen: Replace shingles blown away in storm, patch room for leak around HVAC system, and replace gable end soffits. Office: Replace 1 x 6 fascia missing from storm, replace damaged sliding, replace missing eave drip, patch flat roof on back, and replace shingles blown away in storm. Residence: Replace missing fascia missing from storm. Storage Shed: Replace 10′ x 10′ storage shed demolished in storm.

Project Name: Completion of Work at West Palm Beach Detention Center
Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2004, $17,072
Project Description: Drywall in Annex: Replace bad drywall and repaint. Cleaning Service: Cleaned inside of the Facility. Vacuum Cleaners: Purchased two vacuum cleaners and extra filers for the facility. Water Sod: Purchased hoses and sprinklers to water the freshly installed sod. Toilet Penetrations: Removed toilet and urinal from Annex Building. Checked roof leaks on Annex roof. Bad Smell: Checked pipes in attic to try to find the bad smell. Repaired Pipes: Repaired and replaced some corroded pipes that the bad smell was coming through. Vanity: Installed new vanity in women’s restroom. Laundry Room: Repaired walls in the laundry room. Drains: Snaked out plumbing drains .Blueprints: Made three sets of mechanical drawings for the Facility. Light Bulbs: Purchased extra light bulbs and spray foam for the facility. Dumpsters: Set dumpsters at the site for the employees at the Facility to clean out there trash.

Project Name: Florida Institute for Girls
Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2004, $294,321
Project Description: Plumbing: Install (6) drinking fountains in each of the following day room pods: (1) A-
1811, (2)B-1B19, (3)C-1329, (4)D-1E11, (5) E-1E19, (6) F-1E29; drinking fountains are Oasis, vandal resistant, barrier free, versa cooler, and model #PV8AM. Water and drain pipes must be installed from existing sink in each pod to drinking fountain, install a metal chase around pipes, remove doors from existing sink cabinet and replace with plywood fastened with security screws. ‘strong>Laundry Room: Install and finish walls for office and storage space use, install carpet to match Pod B carpet, reinstall light switch and cover plate, and reinstall existing light fixture. Flooring: Install commercial grade carpet in Pod B, in each of the following rooms: Day room, corridor, classroom, teacher, C/M 1A, and laundry room. Install commercial grade VCT flooring in the following areas: Pod A-Corridor-Dayroom, Pod C-Dayroom, Corridor, Pod D- Dayroom, and Corridor, Pod E- Dayroom, and Corridor, Pod F-Dayroom, and Corridor. Carpet and VCT flooring to stop on corridor side of the doors, with transition strips at each entry way. No flooring to protrude under cell doors. We will remove all existing vinyl base in dayrooms and corridors where we are installing new flooring. There will not be any vinyl base installed to replace areas that will be removed. CCTV Upgrades: (1) nine channel DS2 DVR/with extended Archive/30 day storage cap, (4) 21″ high resolution color monitors, (22) varifocal/auto iris/ high resolution/vandal proof color cameras/lenses. Run additional cables/install DVR/camera/power units/wire and connect all systems/test and verify operation. (2) 16 channel 12/24V power supplies units/(2) six channel 12 VDC/five port data switch for adding units to existing network. (3) direct connect data download units for systems on Phase 1 and 2. (2) 16 channel DS2 DVR with extended archive (30+ days), (20) videocarm color integrated vandal proof C-Cam/dual lenses. Training for Video: (40) hours training to include: introduction to DMs DVR system, operator/function and features of the DVR system, event accessing and downloading to a media, event playback and identification of events, introduction to the MTI access control system, familiarization with panel layout devices and their uses, hands on systems operations, preventive maintenance and upkeep of all security equipment. Painting: Two coats flat latex paint in the following areas: (1) Pod A-Dayroom (2) Corridor, (3) Pod B-Dayroom, (4) corridor, (5) classroom, (6) teacher, (7) C/M 1A, (8) laundry room, (9) Pod C-Dayroom, (10) corridor, (11) Pod D- Dayroom, (12) corridor. Doors and casing facing corridors and dayrooms will be painted with oil based paint. Doors, jambs and casings on opposite of dayrooms and corridors will not be painted. Sound Control Panels: Furnish and install (16) 30″ x 10′ x 2″ sound deadening panels on ceiling of corridors in all (6) pods, furnish and install (24) 2′ x 4′ x 2″ sound deadening panels on ceiling of dayrooms in all (6) pods, furnish and install (15) 2′ x 3′ x 2″ sound deadening panels on wall of dayroom in all (6) pods, and remove ceiling tile in pod that is on wall for sound control. Guard 1 Plus: Furnish and install Guard 1 plus hardware for facility. Includes computer, software, pipe, and touch memory buttons and mounts.

Project Name: Polk RJDC Doors and Hardware
Location: Barlow, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2004, $186,645
Project Description: Remove and replace the following doors, frames, and hardware.
Door Specifications: Doors and Frames 14 ga. Steel Stiffen, Locks- Fo!ger Adams Series 60, Hinges-
hospital tip ball bearing, install closure on common doors, remove old doors from premises, and paint doors to match existing color.

Project Name: Palm Beach Youth Center
Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2003, $5,400
Project Description: 42 Windows (31 ‘A” x 12″)- Install a 1″ x 1″ x 1/8″ steel tube per window. Bar to be
installed vertically at the center of the window. Remove and replace screws in window stops (tamper
resistant type), remove and replace glazing in two windows and one door. Paint the 42 windows and new steel tubes.

Project Name: Wings for Life Repairs
Location: Miami, Florida
Owner: Amikids Wings of South Florida, Inc.
Year Completed/Contract Amount: 2003, $18,127
Project Description: Doors: Remove ten existing doors and jambs, install ten new metal jambs, install ten new 3’0″ x 6’8″ twenty minute fire rated solid core birch doors with 22″ x 28″ wire glass insert, and install a chrome lever handled passage set.

Project Name: Brevard RJDC Master Control Computer System
Location: Titusville, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2003, $109,782
Project Description: Replacement of master control board with mouse-driven, computer screen graphic control system, including equipment rack, cabinetry and finish work in master control room.

Project Name: Brevard Halfway House NC
Location: Titusville, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2003, $4,660
Project Description: Remove and disposal of (2) existing A/C systems, replace NC in front office, back office, and the dorms TV room.

Project Name: Relocating Circuitry From Normal To Generator Power (Osceola RJDC, Pinellas RJDC, and Pasco RJDC)
Location: Kissimmee, Florida; San Antonio, Florida; Clearwater, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2003, $16,110
Project Description: Pasco: Relocate (1) HVAC system at Dining Room from Panel “MDP” to Emergency
panel “LB2″. Pinellas: Relocate (2) HVAC systems at Pod “A” and “B” from panel “LC” to Emergency Panel. Relocate (2) HVAC systems at Pod “E” from Panel “LE” to Emergency Panel “LEE”. Osceola: Install (1) %” conduit with (3) #12 THHN conductors on a dedicated 1P20-amp circuit to Panel “EA” to operate ice
machine on existing generator system. Install (1) 3/4″ conduit with (4) 312 THHN conductors on a dedicated 3P20-amp circuit to “EM” panel to operate stove on existing generator system.

Project Name: Everglades Youth Camp ReRoof
Location: Okeechobee, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2003, $181,648
Project Description: Cafeteria, Multi-Purpose, #2, and Master Control: Tear off existing shingle roof, dry in 301b felt, install new lead flashing, and install 40 year dimensional GAF shingles. Woodwork: Frank Cummins, Inc. has looked at the roofs and the following in their scope. We will inspect all roof sheathing and replace as necessary. We will also brace any deteriorated framing members to ensure the strength of these members is correct. We will re-nail any loose plywood to conform to todays code. Make fascia board repairs, install new continuous screen vents on all buildings, remove and reframe all old roof vents that are to be removed, replace rotten T1-11 gable end plywood, prime and paint with one coat. Replace gable end roof vents to ensure proper venting, and repair two large vents on the cafeteria roof and do the sheet metal work required.

Project Name: Polk RJDC Security System
Location: Bartow, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2003, $112,800
Project Description: Remove and replace (64) cameras, and install an additional (16) cameras. New cameras are WVCP234 color CCTV cameras with rainbow RA-L338VDC4P (3) 8-8 mm automatic iris lenses.

Project Name: Palm Beach RJDC School Board Extras
Location: Palm Beach, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2003, $17,072
Project Description: Replace drywall and repaint, clean inside of the facility, purchase (2) vacuums and extra filters for the Facility, purchase hoses and sprinklers to water the freshly installed sod, remove toilet and urinal from Annex Building, check roof for leaks on the Annex Building, check pipes in attic to try and find bad smell, repair and replace some corroded pipes that the bad smell was coming through, install new vanity in women’s restroom, repair wails in the laundry room, snaked out plumbing drains, made three sets of mechanical drawings for the facility, and set dumpsters at the site for the employees at the Facility to clean out their trash.

Project Name: Osceola RJDC Hurricane Charley Repair
Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2003, $244,297
Project Description: Electrical: Replace (27) 1000 watt high pressure sodium floodlights inside perimeter
fence, replace (5) three light bullhorns on existing concrete pole inside perimeter fence, replace (3) four light bullhorns on existing concrete pole inside the perimeter fence, repair (5) parking lot pole lights as needed, and reattach several lightning protection grip clamps at roof top air conditioning units. Fencing: Refasten hardware cloth and concertina razor wire (1550 FEET), straighten posts only (490 FEET), remove fabric and straighten posts (1553 FEET), remove and replace posts including sidewalk (580 FEET), replace fence on overhangs (2) each, main sallyport repairs, and miscellaneous repairs.

Project Name: Seminole County Juvenile Detention Center
Location: Okeechobee, Florida (Brighton Reservation)
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2003, $109,782
Project Description: H.V.A.C. work, structural bracing, roofing work, ceiling repair work, clean up and trash removal, required electrical work, smoke detectors as required and permit for the building owner.

Project Name: Orange High Rick Facility
Location: Orange County, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2003, $68,935
Project Description: HVAC: Check all compressors and air handlers, clean coils, and change filters as
needed. Electric: Remove and replace (32) two lamp, 120 volt fluorescent ballasts. Remove and replace
(60) four foot fluorescent lamps. Remove and replace (480) existing slotted plate screws and replace with tamper resistant screws. Remove (56) plastic switch plates and replace with stainless steel switch plates. Remove (62) plastic duplex receptacle plates and replace with stainless steel receptacle plates. Check equipment on existing lift station to insure it’s working properly. Replace plastic electric box at front gate with steel box. Plumbing: Repair or replace (3) flush valves, repair (3) tank top toilets, replace (3) aerators, repair/replace (2) shower heads, (1) shower valve handle and cover, (1) Moen shower valve, (2) outside shower heads, water cooler in dining room, and (1) water meter box cover. Security: Inspect, refocus, and clean all camera lenses. Inspect intercom system in all rooms and cells. Replace (2) cameras and inspect all magnetic locks and electric strike plates. Inspect for lighting protection on lines as needed.

Project Name: Orange RJDC Fence Repairs
Location: Orlando, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2003, $54,990
Project Description: Add fence at east annex entrance, and add a fence at the west annex entrance, install (2) B/W CCTV cameras, (2) master intercom stations and 4 local talk stations, (2) magnetic gate locks, all power and cabling.

Project Name: Palm Beach Assessment Center Relocation of Regional Offices
Location: Palm Beach, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2003, $51,874
Project Description: Painting and Wall Preparation: Pressure clean and paint the exterior of the entire
building using latex paint, and prep and paint walls, doors and ceilings in the above listed rooms. Room 146: Build a partition wall approximately 15′ long with an access door. Acoustical ceiling repairs to be made at new wall. Light Fixtures: Replace bulbs, repair or replace as necessary to have all lights functioning properly. Signage: Remove and dispose of room signs (ones that include wordings). Not the room numbers. Add or change any room numbers that are incorrect or missing. Replace keyed light switch with standard type in room 172 and 173. Install (2) duplex outlets between upper and lower cabinets in room 174. Remove existing recessed lights and install (2) 2×4 florescent lights in room 175 and 177. Install a third duplex outlet for CCTV monitor in room 170 and 171. Room 185: Install a phone/data jack on the West End of the north wall. Room 186: Install plastic coated wire ventilated shelving. Room 182: Replace keyed light switches with a standard type, remove cabinetry, remove sink and cap plumbing, terminate all CCTV intercom and electrical wiring, remove counter top, and emergency generator annunciators (2) to remain in existing location. Room 206: Replace keyed light switch with a standard type, and install a phone/data drop. Room 176, 183, and 194: Replace keyed light switch with a standard type. Room 179: Install a duplex outlet on the exterior of the North wall. Rooms 195, 196, 197, and 198: Paint only.

Project Name: Southern Glades Youth Camp Generators
Location: Dade County, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2003, $28,642
Project Description: Remove fence around generator to gain access to unit, disconnect switching gear from FPL power, prep generator for transporting, load generator on low bed and transport to Everglades for later use, FPL to repower all systems at Southern Glades, store switching gear in dry storage, and unload
generator in parking lot.

Project Name: Palm Beach Youth CCTV
Location: West Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2003, $167,000
Project Description: Install CCTV system including: (2) monitors, (1) multiplexer, (1) complete playback station to be installed in superintendent’s office, (2) pan tilt controllers for exterior cameras located in the yard, dayroom and cell corridors (2 cameras), work-shop metal building (2 cameras), basketball court and yard (2 pan-tilt cameras with zoom capabilities), classroom area Metal Building (2 cameras), small corridor off a dayroom (1 camera), HVAC service, install emergency generator, install light fixtures and cell lights, install doors and hardware, install flooring, install sound panels in the Dayroom, paint all cells, dayroom, kitchen, and bathrooms, remove (4) urinals, build a storage closet, and repair drywall.

Project Name: Seminole RJDC Repairs
Location: Okeechobee, Florida (Brighton Reservation)
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2003, $68,400
Project Description: Remove and replace six five ton package A/C units.

Project Name: Sago Palms HVAC
Location: Palm Beach, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2002, $50,000
Project Description: 1.) A/C froze up, checked the system found unit circuit #1 fan installed by another company running backwards, reset thermostat, thaw out unit, turn fan around so the unit would run correctly, and add Freon in circuit #2. 2.) system froze up, checked the unit and found a Freon leak at the feeder tubes, repair leak and check out the system, and recharge unit on circuit #2. 3.) Checked the system and found circuit #2 grounded compressor, circuit #1 faulty hot SAS valve, and system had one compressor working. 4.) One circuit out of Freon, repair (6) leaks, and evaporator coil found locked up due to another company bypassing all safety switches.

Project Name: Seminole RJDC Upgrades
Location: Okeechobee, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2002, $90,508
Project Description: Install a security door locking system at front entry/lobby, replacement of toilets/sinks with stainless steel, countertop work, HVAC system and related repairs for boys modules.

Project Name: Florida Institute for Girls
Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2002, $50,000
Project Description: Furnish and installed the following: (4) 16 Port Digital multiplex recorders, (1) 21′ high resolution digital video monitor, (42) color mini dome high resolution video surveillance cameras, (3) rolls multifunction video cables with BNC, and (48) AC-DC Power Supply unit with power surge protection, re-power trigger capabilities.

Project Name: St. Lucie Lift Station Location: Port Saint Lucie, Florida
Owner: Regional Juvenile Department Center
Year Completed/Contract Amount: 2002, $8,755
Project Description: Remove existing lift station control panel and install new lift station control panel provided by others.

Project Name: Polk RJDC Chiller
Location: Bartow, Florida
Owner: Regional Juvenile Department of Corrections Year Completed/Contract Amount: 2002, $95,964
Project Description: Furnish and install a new Irene self contained 40 ton air cooled package Water Chiller System, this system is located outside of the mechanical room. The old remote chiller and outdoor cooling tower were removed along with all of the existing water piping in the mechanical room for installation of new water piping and bypass for pump option. We flushed out the chiller lines that service the air handler units and installed new gauges for the system, such as water temperature and line pressures.

Project Name: Brevard RJDC Roofing
Location: Titusville, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2002, $35,315
Project Description: Remove all excess loose gravel (clean up and haul away), mechanically attach one
layer of 1.5 ISO insulation R-10, mechanically attach Seaman Corporation “Fibertite” .036 mill single ply
membrane heat welding all seams creating a monolith roof system, fabricate and install new Fiberclad metal scuppers, supply and install new prefabricated soil stack boots and accessories, install according to all Seaman Corporation, state, and local codes, and furnish contractor two year warranty.

Project Name: Brevard Halfway House HVAC
Location: Titusville, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2002, $20,000
Project Description: Replace A.C. unit closest to street on North side of Living Quarters. Unit to be replaced is a Carrier Air Handler Model No. 40A0030-300BB and Rudd Compressor UPGC-030JAS, replace A.C. unit approximately centered on North side of Living Quarters. Unit to be replaced is a Rudd UAGE-60JAS and UEAB-2015JZA.

Project Name: Sunland Administration Building
Location: Orlando, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2002, $155,941
Project Description: Extend walls including metal studs, drywall and painting to the underside of the finished ceiling, installation of one Luan hollow core door per each work area, remove and replace two florescent lights per each bathroom, remove and replace three toilets, paint bathrooms, HVAC (remove and replace two 7.5 ton heat pump condensing units, install two liquid driers on the discharge line, make duct work modifications for work stations being modified, and remove and replace two exhaust fans.

Project Name: Datewood Gym Security
Location: Orlando, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2002, $47,000
Project Description: (14) security cameras, intercom stations at cattle chute gates, control of all gates in cattle chute from housing area to gymnasium. All labor and wiring to install equipment. Final terminations at the control panels in Master Control.

Project Name: Seminole RJDC Cell Door Window(s) Replacement
Location: Okeechobee, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2002, $14,375
Project Description: Remove and replace 23 cell door window frames and lexan glazing. The window sizes are now 14″ x 14″.

Project Name: Volusia RJDC Renovations
Location: Daytona Beach, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2002, $73,010
Project Description: Remove and replace (30) doors with polycarbonate view light, remove and replace (108) hinges, and install (4) door closures.

Project Name: Orange RJDC Renovations
Location: Orlando, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2002, $142,161
Project Description: Replace (5) stainless steel toilets with Sloan valves, (9) single stainless steel wall hung lavatories, faucets furnished by owner, (3) acorn stainless steel two way shower valves, and (3) acorn stainless steel single shower valves.

Project Name: Palm Beach Youth Club
Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2002, $17,324
Project Description: Repairs to plumbing and concrete block walls in showers, including disconnecting and repairing plumbing fixtures and pipes in shower walls; removal and replacement of saturated concrete block shower walls; and replacement of all damaged floor tile.

Project Name: Palm Beach Youth Center Renovations Location: Palm Beach, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2002, $60,477
Project Description: Install CCTV System: System to include installation and operation of the following
security equipment- monitors, (1) multi-plexer, (1) complete playback station to be installed in
superintendents office, (2) pan-tilt controllers for exterior cameras located in the backyard, dayroom and cell corridors (2 cameras), visitors area (1 camera), office corridor (2 cameras), dining area(2 cameras), computer room classroom(2 cameras), work shop-metal building (2 cameras), basketball court and yard(2 pan-tilt cameras with zoom capabilities, classroom area metal building, and small corridor of dayroom. HVAC: Service equipment (service to include coil cleaning, duct repair/seal joints as needed, filter replacement overall, complete service to insure efficiency of cooling and heating for the entire facility.) Emergency Generator: Service generator (to be done by certified Generator Repair/ Service Company) Both engine and stator as well as fuel and electrical connection to be included. Electrical System: Light fixtures replace bulbs, ballasts, repair as necessary to have all lights functioning properly (all replacements shall be energy efficient IE: T8 Tubes, electronic ballast) Cell lights (20)- Remove existing wall mounted lights and install on the ceilings. Move the switch bank for (2) cells and laundry room from Dayroom. Relocate Master Control, and remove receptacles over vanity at bathroom in Mod. (Install steel covers with security screws)Doors and Hardware: Remove and replace the 12 cell doors and hardware. Existing doors are to be stored by DJJ at a determined site (Replacement doors to be hollow metal 14/12 gauge with ‘A” panel, security glazing. Hardware to be correctional (security) grade approved by DJJ project manager. Flooring: Remove carpet and install VCT tile in the Dayroom and Cells. Noise Control: Install sound panels in the Dayroom (location to be approved by DJJ staff) Painting: Paint all cells, dayroom, kitchen, and bathroom using epoxy paint. Plumbing: Inspect and report on hot water controls along with entire plumbing system, remove (4) urinals, and cap off plumbing. Storage Closet: Build a storage closet using space presently occupied by (4) urinals. Build a partition wall with an access door. Toilet Paper Holders: Remove and patch tile. Tile: Remove and replace cracked/chipped ceramic tile in the bath and shower rooms. The majority of the broken tile is base tile. Clean and seal all grout in both the bath and shower rooms. Drywall: Repair all walls prior to painting, remove and replace damaged drywall on ceiling in closets under HVAC system in the shop and classroom spaces. Site Work: Pave the parking lot, approximate dimensions are 64′ x 150′.

Project Name: Osceola Detention Facility
Location: Osceola County, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2001, $26,941
Project Description: Uninstall video equipment to repair cosmetic cracks to the existing building. Once finished we painted the repairs and reinstalled the video equipment.

Project Name: Volusia RJDC Security Repair
Location: Daytona, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2001, $56,000
Project Description: Cells Mod A83 Remove and replace 26 doors with 14 GA steel stiffen 30″ width, height as specified by template. Locks Folger Adams Series 60. All doors with a view light 6″ x 34″ with ‘A” tempered glass (clear). Shower Room Mod A&B: Remove and replace 2 Ea.-2668 14 GA Steel Stiffen Doors 30″ width. Height as specified by template. Locks folger Adams Series 60. All doors with view light 6″x34″ with ‘A” tempered glass (clear). Entry Doors Mod A&B: Remove and replace doors 2 EA 3068 14 GA Steel Stiffen doors 36″ width. Height as specified by template. Locks folger Adams Series 60. All doors with view light 6″x34″ with ‘/2′ tempered glass clear. Replace magnetic lock with new locknetics mag lock. Isolation Cells: Remove and replace 4 EA-2668 14 GA Steel Stiffen doors 30″ width. Height as specified by template. Locks folger Adam Series 60. All doors with view lights 6″x34″ with “A” tempered glass clear. Fire Exit Doors: Remove and replace 2 EA-3070 14 GA Steel Stiffen doors. Lock- Corbin Russwin ML20-
29 lock bodies, no trim.

Project Name: Orange RJDC Surveillance Location: Orlando, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2001, $1,398.68
Project Description: Upgrade of surveillance system to add 61 cameras, 4 multiplexers, 4 monitors, and 4 videocassette recorders.

Project Name: Polk RJDC Flooring Location: Bartow, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2001, $34,828
Project Description: Remove existing carpet and ceramic tile. Install ceramic tile throughout. New tile to be 6 x 6 and slip resistant.

Project Name: Brevard Juvenile Halfway House Location: Titusville, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount: 2001, $109,782
Project Description: Visitors Lounge: Install (1) 24 volt B/W CCD camera. Mount camera in a wedge style housing. Align this camera to see activity in this room as well as the entrance door. Resident Hallway: Install (1) 24 volt B/W CCD camera. Mount camera in a wedge style housing. Camera to see activity in this hallway. Clinic Office: Install (1) 24 volt 5/W CCD camera. Mount camera in a wedge style housing. Position to see Medicine cabinet and door if possible. Day Room: Install (1) 24 volt BIW CCD camera. Mount camera in a wedge style housing. Position camera in the corner opposite the front door in order to see as much of this room as possible, as well as the entrance. Recreation Building: Install (1) 24 volt BIW CCD camera. Mount camera in a wedge style housing. Position camera to see as much as possible in this room and all three doors. Dining Hall: Install (1) 24 volt B/W CCD camera. Mount camera in a wedge style housing. Align this camera to see as much of Dining Hall as possible, particularly, the cabinets and serving line.

Project Name: Sago Palm Mold Remediation
Location: Pahokee, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2001, $229,593
Project Description: Perform a complete mold remediation and tear out damaged compromised materials above and beyond the remedial protocol provided by the testing agency report that was supplied to us by the Department of Juvenile Justice, seal all surfaces after cleaning, and include bacterial cleaning agent through the A/C duct systems. Floor Finish: Strip the finish off the old vinyl tile flooring and install a new wax shine covering. Drywall: Install new drywall to replace material removed from mold remediation, paint new drywall with a primer and one finish coat of paint, install new baseboard as needed, and install new insulation to replace insulation being removed from mold damage.

Project Name: Orange Juvenile Detention Center Location: Orlando, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2000, $38,060
Project Description: Replace public address system; call button installation at west wing exterior door and sallyport; and replacement of (8) room doors.

Project Name: Brevard Halfway House Security and Repairs Location: Titusville, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2000, $32,344
Project Description: Install security cameras and video surveillance system, build new fencing, replace HVAC, and repair ventilation system in the bathroom.

Project Name: Seminole Detention Center Location: Okeechobee, Florida
Owner: Department of Juvenile Justice
Year Completed/Contract Amount:2000, $90,826
Project Description; Install security door locking system at front entry/lobby, replacement of toilets/sinks with stainless steel, countertop work, HVAC system and related repairs for boys’ module.

Project Name: Brevard Half Way House
Location: Titusville, Florida
Owner: Regional Juvenile Detention Center
Year Completed/Contract Amount: 2000, $44,324
Project Description: Survey boundary and supply copies, install fence fabric on inside of post, install (3) strands of barbed wire at top of fence fabric on inside of fence, install 1/2″ x ” x 4′ wide hardware cloth on top 4′ of fence fabric, remove only trees and shrubs that interfere with fence insulation.

Project Name: Brevard RJDC Re-roofing Location: Titusville, Florida
Owner: Florida Department of Corrections
Year Completed/Contract Amount: 2007, $87,250
Project Description: Re-roofing of existing building.